Storage (Duration 1h)

2 unique locations (11 components)

Land next to Capenhurst substation, Ledsham, Ellesmere Port, CH66 2HD (1 component)

49.9MW Battery Storage facility located at Capenhurst GSP

Active • 2024-25 (T-4)
12.36 MW
Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW (10 components)
• 1.200MW of battery storage located at Durham.
• 1.200MW of storage located at Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW
• Battery storage located at Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.52 MW
Loading map...
Showing 2 locations