Storage (Duration 1h)

2 unique locations (13 components)

Windsor Battery East, Millstream East, Maidenhead Road, Windsor, Berkshire, SL4 5GD. (10 components)
• 10no. twin pack gas generators with 10no. transformers, DNO substation, 33kV switchroom and ancillary requirements
• Battery Storage
• Glenlee hydro power station - Unit 1, part of the Galloway hydroelectric scheme. The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
0.09 MW
Feddal Battery Storage, Land located at Feddal Estate, Braco, Dunblane, Perthshire FK15 9RA (3 components)

New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).

Active • 2027-28 (T-4), 2025-26 (T-1) ...
4.51 MW