Storage (Duration 1h)

2 unique locations (107 components)

Barton Hill Way, Torquay, TQ2 8JG (9 components)
• Existing CMU comprising of battery storage and associated plant
• New Build CMU comprising of battery storage and associated plant
• New build CMU employing reciprocating engines running on natural gas. The Financial Commitment Milestone has been achieved. The site will generate at unity and therefore a power factor of 1.0 has been used to convert MVA to MW.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
25.38 MW
AB51 (98 components)
• Domestic EV
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
140.87 MW