Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1h)

2 unique locations (11 components)

Leighton Hall Farm, Middlewich Road, Leighton, Crewe, CW1 4QH (4 components)
• 10 x 2MW/2MWh containerised Energy Storage System Units to be installed on designated land at Leighton Hall Farm.
• Unit 1 Cruachan pumped storage hydro plant
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Carlton, Stockton-on-Tees, TS21 1EA (7 components)
• 1.200MW of battery storage located at Stockton-on-Tees.
• Battery storage located at Carlton, Stockton-on-Tees, TS21 1EA with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.91 MW
Loading map...
Showing 2 locations