Storage (Duration 1h)

5 unique locations (116 components)

Unit 28,29,30, Peel Mills Industrial Estate, Chamberhall Street, Bury, BL9 0LU (19 components)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• EV charging at residential premises
• Generating Unit 2
Active • 2028-29 (T-4), 2027-28 (T-4) ...
52.05 MW
Tummel Power Station, Pitlochry, Perthshire, PH16 5SB (41 components)
• 1 x hydro turbine & synchronous generator
• Battery Energy Storage system operating alongside solar farm
• Solar Farm consisting of solar PV modules and inverters
Active • 2028-29 (T-4), 2027-28 (T-4) ...
104.16 MW
SMACC Melting Shop, Shepcote Lane, Europa Link, Sheffield, S9 1TZ (23 components)
• 1 x hydro turbine & synchronous generator
• Battery Energy storage linked to solar farm
• DSR component providing load turn-down at a steel melting facility with electric arc-furnaces
Active • 2028-29 (T-4), 2025-26 (T-4) ...
141.03 MW
Land off Ely Road, Chittering, Cambridge, Cambridgeshire, CB25 9PN (9 components)
• Gas-fired reciprocating engines fitted with heat and CO2 recovery equipment, plus transformers, switchgear and associated controls with a total connection capacity of 9MW.
• Genset 3
• The CMU component at Breach Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 MW.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
24.30 MW
Inverawe Power Station, Inverawe, by Taynuilt, Argyll, PA35 1HU (24 components)
• 1 x hydro turbine & synchronous generator
• 1x hydro turbine & synchronous generator
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
91.46 MW
Loading map...