Storage (Duration 1h)

17 unique locations (270 components)

Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (67 components)
• A gas engine CHP site providing electricity & heat to the associated development
• A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered seperately to the CHP
• Load reduction on site supported by non-exporting standby generation.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
West Marsh Road Spalding Lincolnshire PE11 3BB (16 components)
• Battery storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG with a nameplate capacity of 1.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
• Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 8MW connections (of which this is one of the two CMU components) and it is connected to the local gas network. Kiln Power has a single Balancing Service ID - NGSTORKILN218. To distinguish between the two components of the CMU a numbering system has been used. The two components are separately metered.
• Wind Turbines to be installed at Crossdykes Wind Farm
Active • 2027-28 (T-4), 2024-25 (T-4) ...
255.05 MW
Thurscoe Business Park, Barrowfield Rd, Thurscoe, Rotherham S63 0DB (4 components)
• 5MW of Lithium Ion battery storage and power conversion systems.
• Gas reciprocating engines
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2023-24 (T-4), 2022-23 (T-3)
RPC Containers Ltd, Schofield Rd, Oakham LE15 6RW United Kingdom (5 components)
• 5 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for 20mw which is split between CMUs - further detail in covering letter
• CHP Unit
Active • 2025-26 (T-4), 2025-26 (T-1) ...
4.22 MW
Redscar Business Park, Longridge Road, Preston, UK, PR2 5NQ (9 components)
• A 49MW New Build Battery Storage Site.
• A 49MW existing Battery Storage Site.
• Component has yet to be procured.
Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
10.01 MW
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (19 components)
• A New Build battery energy storage system.
• An existing battery energy storage system.
• EV charging at residential premises
Active • 2026-27 (T-4), 2025-26 (T-1) ...
76.74 MW
Oaks Business Park, Oaks Lane, Barnsley, S71 1HT (7 components)
• A 40MW New Build Battery Storage site
• A 45MWh New Build Battery Storage site
• Component has yet to be procured.
Active • 2025-26 (T-4), 2023-24 (T-4) ...
22.08 MW
New River Head TWRM Shaft & WBS, Amwell Street, Finsbury, London, United Kingdom, EC1R 1XU (4 components)
• 20.000MW of storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
4.09 MW
Marchwood ERF, Oceanic Way, Marchwood Industrial Park, Normandy Way, Marchwood, Hampshire SO40 4BD (13 components)
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• New Battery Storage Site comprising brand new batteries & inverters
• SolarPV generating station
Active • 2028-29 (T-4), 2026-27 (T-4) ...
10.68 MW
LAND ON THE SOUTH SIDE OF FAIRY LANE, SALE, M33 2JU. (Nearest postcode to grid reference: M33 2JT). (9 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Battery Storage Plant
• Single Shaft CCGT (Module 2)
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Glyn Rhonwy Pumped Storage Facility, Ffordd Clegir, Caernarfon, Gwynedd LL55 4EL Note: The site is currently brown field with no ability to receive post. As such this address uses the nearest current postcode. (13 components)
• 49.999 MW pumped storage facility in Gwynedd, North Wales.
• A new Build Generating Storage CMU
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
284.81 MW
Friar's Pride Oxney Rd, Peterborough, PE1 5YW, United Kingdom (4 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA
• The CMU component at Russell Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 MW.
Inactive • 2023-24 (T-4), 2020-21 (T-4) ...
EDF Energy, Hunterston B power station, West Kilbride, Ayrshire, KA23 9QX (40 components)
• Existing CCGT Unit
• Hunterston B Power Station CMU 7: [HU7-21] T_HUNB-7 + (50% x T_HUNB-D) + (50% x E_HUNB-11S)
• Hunterston B Power Station CMU 8: [HU8-21] T_HUNB-8 + (50% x T_HUNB-D) + (50% x E_HUNB-11S)
Active • 2025-26 (T-4), 2024-25 (T-4) ...
1607.21 MW
Chippenham Station, Cocklebury Lane, Chippenham, SN15 1RS (11 components)
• 4 x reciprocating engines
• A 20MW New Build Battery Storage site
• CHP Unit
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Centrica Peterborough Power Station, Storeys Bar Road, Peterborough, PE1 5NT. (26 components)
• 1 x hydro turbine & synchronous generator
• 4MW battery co-located with a solar farm
• Centrica Peterborough Power Station (PPS) is an Open Cycle Gas Turbine (OCGT) electricity generating station.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
650.00 MW
BWW026, Pucklechurch, Shortwood Road, Pucklechurch, Bristol, BS16 9PQ (19 components)
• Battery Energy Storage System
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
7.31 MW
Boiler House, Central Manchester University Hospital, Oxford Road, Manchester M13 9WL, UK (4 components)
• A 20MW New Build Battery Storage site
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
• The Prospective Generating Unit will be an Edina TCG 2032B V16 4.5MWe CHP Gas Engine (or similar) situated on Central Manchester University Hospital site.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Loading map...
Showing 17 locations