Storage (Duration 1h)
34 unique locations (169 components) - Page 1 of 2
Arbroath Battery, East Muirlands Road, Arbroath, DD11 2QH (7 components)
Back Lane, Chesterfield, S44 5XQ (8 components)
Baglan Energy Park, Briton Ferry, Port Talbot, SA11 2GA (3 components)
Basing Road, Basingstoke, RG24 7AN (3 components)
New Build CMU comprising of battery storage and associated plant
Bilton Farm, Preston Road, Hull, HU11 4DZ (8 components)
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (8 components)
Ferrymuir Farm, Cupar, KY15 5RW (3 components)
49.900MW one-hour duration battery energy storage facility.
FORDTOWN ENERGY STORAGE, KINTORE, INVERURIE, AB51 0XJ (3 components)
49.99MW Lithium-ion Energy Storage System
Gateshead Electric Forecourt, Park Road, Felling by-pass, Gateshead, NE10 0EA (2 components)
6.000MW Battery Energy Storage System to be installed at Gateshead Electric Forecourt
Gateway Crescent, Oldham Broadway Park, Oldham, Lancashire OL9 9XB (1 component)
The CMU comprises of Lithium Ion batteries (1-hour duration) to be installed within an existing warehouse. The batteries will be installed in standard CATL modules with an internal racked system …
Gipsy Lane, A664, Rochdale, OL11 3HA (3 components)
A Battery Energy Storage System
Harestanes Wind Farm, AE Forest, Nr Parkgate, Dumfries and Galloway, DG11 1TU (2 components)
High Flatworth, North Shields, Tyne and Wear, NE29 7SW (3 components)
Junction 3 Business Park, Balby carr bank, Doncaster DN4 8DE (4 components)
10MW of Battery Energy Storage Systems to be built.
Knottingley Hydropower Station, Brotherton Weir, Knottingley, West Yorkshire, WF11 8HR (3 components)
1.200 MW battery storage
Land At Brook Farm, Off Church Hill Road, North Of Burstall (in Close Proximity To The Bramford Substation Off Bullen Lane), Ipswich, Nearest IP8 4LB (4 components)
battery storage asset 49.900MW/49.900MWh
Land at Weirs Drove, Cambridge, CB25 0BP (5 components)
Land east of Maldon Hall Farm, Maldon, Essex, CM9 6HD (4 components)
Land North East Of Newton Wood Farm Newtonwood Lane Newton, NEAREST DE55 5SG (4 components)
New build battery storage 50.000MW/50.000MWh one hour duration asset
Land off Dunsinane Avenue, Dunsinmore Industrial Estate, Dundee, Scotland, DD2 3QF (3 components)
Land on the South Side of Fairy Lane, Sale, M33 2JU (7 components)
Battery Storage Plant
Land South of NG Capenhurst Substation, Capenhurst Lane, Capenhurst, Cheshire, CH1 6HE (16 components)
4 controllable Battery BMUs located at the Capenhurst site with 2 auxiliary station load BMUs
Land West of Hopewell Street, Stairfoot, Barnsley, S70 3ET NEAREST (4 components)
Battery storage 40.000MW/40.000MWh one duration battery new build
Located on the land of Westlands Farm, Westlands Lane, Whitley, Melksham, SN12 7QG (12 components)
Battery Storage Plant