Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1h)

34 unique locations (169 components) - Page 1 of 2

Active MW: 0.00 MW
Inactive MW: 0.00 MW
Arbroath Battery, East Muirlands Road, Arbroath, DD11 2QH (7 components)
• Battery storage plant
• Existing generating battery storage unit.
Storage (Duration 1h) Storage (Duration 2h) ARBROATH LIMITED New Build Generating CMU Arbroath 17.5MW 2hour BESS Arbroath 17.5MW 2hour BESS +4 more DD11
Active • 2025-26 (T-4), 2024-25 (T-1) ...
15.89 MW
Back Lane, Chesterfield, S44 5XQ (8 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for 20mw which is split between CMUs - further detail in covering letter
• 5 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for 20mw which is split between CMUs - further detail in covering letter
• A Battery Energy Storage System.
Storage (Duration 1h) ARL 027 LIMITED New Build Generating CMU Back Lane Back Lane +2 more S44
Active • 2024-25 (T-4), 2023-24 (T-4) ...
3.72 MW
Baglan Energy Park, Briton Ferry, Port Talbot, SA11 2GA (3 components)
• New build one-hour duration storage to replace diesel plant
• One-hour duration Battery Storage Plant.
Storage (Duration 1h) PULSE CLEAN ENERGY UK LIMITED New Build Generating CMU BATT01 BATT01 SA11
Active • 2025-26 (T-4), 2024-25 (T-1) ...
5.32 MW
Basing Road, Basingstoke, RG24 7AN (3 components)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 1h) CONRAD (BASINGSTOKE) LIMITED New Build Generating CMU Basingstoke Basingstoke +1 more RG24
Active • 2026-27 (T-4), 2025-26 (T-4) ...
5.14 MW
Bilton Farm, Preston Road, Hull, HU11 4DZ (8 components)
• Battery Energy storage linked to solar farm
• Solar farm
Storage (Duration 1h) WARRINGTON RENEWABLES (HULL) LIMITED New Build Generating CMU BILTON FARM BILTON FARM HU11
Active • 2024-25 (T-4), 2023-24 (T-1) ...
3.45 MW
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (8 components)
• A new build 48MW battery energy storage system
• A new build 49.5MW battery energy storage system
Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) HARMONY CTF LIMITED New Build Generating CMU CLAY TYE FARM CLAY TYE FARM +4 more RM14
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Ferrymuir Farm, Cupar, KY15 5RW (3 components)

49.900MW one-hour duration battery energy storage facility.

Storage (Duration 1h) GSES 1 LIMITED New Build Generating CMU Ferrymuir Ferrymuir +1 more KY15
Active • 2025-26 (T-4), 2024-25 (T-1) ...
14.94 MW
FORDTOWN ENERGY STORAGE, KINTORE, INVERURIE, AB51 0XJ (3 components)

49.99MW Lithium-ion Energy Storage System

Active • 2025-26 (T-4), 2024-25 (T-1) ...
14.97 MW
Gateshead Electric Forecourt, Park Road, Felling by-pass, Gateshead, NE10 0EA (2 components)

6.000MW Battery Energy Storage System to be installed at Gateshead Electric Forecourt

Storage (Duration 1h) GATESHEAD ELECTRIC FORECOURT LTD Gateshead Electric Forecourt Rejected NE10
Active • 2026-27 (T-4), 2023-24 (T-1)
1.83 MW
Gateway Crescent, Oldham Broadway Park, Oldham, Lancashire OL9 9XB (1 component)

The CMU comprises of Lithium Ion batteries (1-hour duration) to be installed within an existing warehouse. The batteries will be installed in standard CATL modules with an internal racked system …

Storage (Duration 1h) FIELD OLDHAM LTD New Build Generating CMU Field Oldham OL9
Inactive • 2023-24 (T-1)
3.72 MW
Gipsy Lane, A664, Rochdale, OL11 3HA (3 components)

A Battery Energy Storage System

Storage (Duration 1h) ARL 001 LIMITED New Build Generating CMU Gipsy Lane Gipsy Lane +1 more OL11
Active • 2024-25 (T-4), 2023-24 (T-1) ...
3.35 MW
Harestanes Wind Farm, AE Forest, Nr Parkgate, Dumfries and Galloway, DG11 1TU (2 components)
• 1 x 50MW Lithium-ion battery with duration of 1 hour
• 1 x 50MW Lithium-ion batteryw with duration of 1 hour
Storage (Duration 1h) SCOTTISHPOWER RENEWABLES (UK) LIMITED New Build Generating CMU Harestanes Harestanes DG11
Active • 2025-26 (T-4), 2023-24 (T-1)
9.30 MW
High Flatworth, North Shields, Tyne and Wear, NE29 7SW (3 components)
• New build one-hour duration storage to replace diesel plant
• One-hour duration battery storage project.
Storage (Duration 1h) PULSE CLEAN ENERGY UK LIMITED New Build Generating CMU BATT09 BATT09 NE29
Active • 2025-26 (T-4), 2024-25 (T-1) ...
4.42 MW
Junction 3 Business Park, Balby carr bank, Doncaster DN4 8DE (4 components)

10MW of Battery Energy Storage Systems to be built.

Storage (Duration 1h) DONCASTER POWER (10MW) LIMITED New Build Generating CMU DONC01 DN4
Active • 2025-26 (T-4), 2024-25 (T-1) ...
2.99 MW
Land at Weirs Drove, Cambridge, CB25 0BP (5 components)
• 49.900MW/49.900MWh battery storage asset, 1 hour duration
• The CMU component at the Burwell Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 49.900MW each.
Storage (Duration 1h) CARE POWER (BURWELL 1) LIMITED New Build Generating CMU BURWB1 Burwell Battery Storage Facility CB25
Active • 2025-26 (T-4), 2024-25 (T-1) ...
14.84 MW
Land east of Maldon Hall Farm, Maldon, Essex, CM9 6HD (4 components)
• 40 MW/40MWh BESS
• 40MW of battery storage located in Essex
Active • 2025-26 (T-4), 2024-25 (T-1) ...
11.98 MW
Land North East Of Newton Wood Farm Newtonwood Lane Newton, NEAREST DE55 5SG (4 components)

New build battery storage 50.000MW/50.000MWh one hour duration asset

Active • 2025-26 (T-4), 2024-25 (T-1) ...
14.91 MW
Land off Dunsinane Avenue, Dunsinmore Industrial Estate, Dundee, Scotland, DD2 3QF (3 components)
• 49.9MW Lithium-ion Energy Storage System
• 49MW Lithium-ion Energy Storage System
Storage (Duration 1h) SUSI EELPOWER DUNSINANE LIMITED New Build Generating CMU LYND21 LYND21 DD2
Active • 2024-25 (T-4), 2023-24 (T-1) ...
9.28 MW
Land on the South Side of Fairy Lane, Sale, M33 2JU (7 components)

Battery Storage Plant

Active • 2025-26 (T-4), 2024-25 (T-1) ...
29.41 MW
Land South of NG Capenhurst Substation, Capenhurst Lane, Capenhurst, Cheshire, CH1 6HE (16 components)

4 controllable Battery BMUs located at the Capenhurst site with 2 auxiliary station load BMUs

Storage (Duration 1h) Zenobe Capenhurst Limited New Build Generating CMU Capenhurst Capenhurst +1 more CH1
Active • 2025-26 (T-4), 2024-25 (T-1) ...
29.94 MW
Land West of Hopewell Street, Stairfoot, Barnsley, S70 3ET NEAREST (4 components)

Battery storage 40.000MW/40.000MWh one duration battery new build

Storage (Duration 1h) CARE POWER (BARNSLEY) LIMITED New Build Generating CMU BARNB1 S70
Active • 2025-26 (T-4), 2024-25 (T-1) ...
11.87 MW
Located on the land of Westlands Farm, Westlands Lane, Whitley, Melksham, SN12 7QG (12 components)

Battery Storage Plant

Storage (Duration 1h) Storage (Duration 2h) MELKSHAM EAST STORAGE LIMITED New Build Generating CMU Melksham East Storage1 Melksham East Storage1 +3 more SN12
Active • 2025-26 (T-4), 2024-25 (T-1) ...
37.74 MW
Newlands Farm, Tanners Lane, Fareham, PO14 2HT (5 components)
• 10MW Storage
• 15MW of Battery Energy Storage Systems
• 20MW of Battery Energy Storage Systems
DSR Storage (Duration 1h) FAREHAM ENERGY RESERVE 2 LIMITED LIMEJUMP LTD Unproven DSR CMU New Build Generating CMU FAR226 PO14
Active • 2025-26 (T-4), 2024-25 (T-1) ...
5.42 MW
Loading map...
Showing 25 locations