Storage (Duration 1h)

2 unique locations (9 components)

Plot C Land at Severn Road Avonmouth BS10 7SE (3 components)

The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy Storage System (BESS) that can either operate as import or export at will. …

Inactive • 2023-24 (T-4), 2022-23 (T-4)
25.50 MW
Land at the corner of Hull Road and Salt End Lane, HU12 8PP (6 components)
• A generating station consisting of multiple reciprocating engines and alternators located on a single site.
• The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy Storage System (BESS) that can either operate as import or export at will. The connection is to be provided at 33KV by installing an underground cable with a metering circuit breaker located at the customer's site.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
46.54 MW