Storage (Duration 1h)

1 unique locations (3 components)

Active MW: 8174.73 MW
Inactive MW: 278.73 MW
Church Bottom, Salisbury, SP4 6NN (3 components)
β€’ 10 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
β€’ 19 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
β€’ 20 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
Storage (Duration 1h) ARL 008 Limited New Build Generating CMU Conditional SP4
Inactive β€’ 2022-23 (T-4)
Loading map...