Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (68 components)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Whitehouse Farm, Rhydd Road, Guarlford, WR13 6NZ (13 components)

The CMU component at Whitehouse Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 …

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Welkin Road, Bredbury, SK6 2BH (4 components)
• A gas fuelled generating station.
• Battery Energy Storage System
Active • 2026-27 (T-4), 2025-26 (T-1) ...
7.79 MW
Wearmaster House, Malthouse Lane, Hurstpierpoint, Hassocks, BN6 9LA (22 components)
• A new build 32MW battery energy storage system
• A new build 34MW battery energy storage system
• A new build 34MW battery energy storage system commissioned in July 2021
Active • 2024-25 (T-4), 2023-24 (T-1) ...
66.68 MW
The Street, Hacheston, Woodbridge, Suffolk, UK, IP13 9ND (10 components)
• A 50MW New Build Battery Storage site
• Existing 50MW Battery Storage site
Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
The Common, Malmesbury, Wiltshire, SN16 9RJ (11 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
• 19 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
• A Battery Energy Storage System.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
STOR no.1 site, Ernesettle Road, PLymouth PL2 5TT (5 components)

Storage facility

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Spitfire Way, Wholeflats, Grangemouth FK3 9UB Note: This is the same location as SWGAS3. However, this site will be split, with independent connections, companies and planning permissions. We have uploaded a map to show exact location. (5 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Russell Farm, Hursley, Winchester SO21 2UZ (15 components)

The CMU component at Russell Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 …

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Redscar Business Park, Longridge Road, Preston, UK, PR2 5NQ (11 components)
• A 34MW New Build Battery Storage Site.
• A 49MW New Build Battery Storage Site.
• A 49MW existing Battery Storage Site.
Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
10.01 MW
Potmans Lane, Battle, TN33 9BL (8 components)

A Battery Energy Storage System

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Petts Wood, Eynsford Close, Orpington, BR5 1DP (3 components)
• 7 x 1mw Battery Storage units to be installed on designated land at Petts Wood
• A Battery Energy Storage System
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
NORWICH ROAD INDUSTRIAL ESTATE, HALESWORTH, SUFFOLK, IP19 8QJ (9 components)
• The CMU component at Halesworth is an energy storage system comprised of batteries and will have an import and export capacity of 40MW.
• The CMU component at Halesworth is an energy storage system comprised of batteries and will have an import capacity of 40 MVA and export capacity of 40 MW.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
8.54 MW
Mill Farm Caythorpe Heath Ln Caythorpe Grantham NG32 3ER (23 components)
• 7 MW of Battery Storage loacated at Grantham.
• 7 MW of Battery Storage located at Grantham.
• Battery Storage located at Grantham.
Active • 2028-29 (T-4), 2024-25 (T-4) ...
4.50 MW
Meadowcroft Farm, Gretton Fields, Gretton, GL54 5HJ (9 components)

The CMU component at Meadowcroft Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 5 MW export capacity and an import capacity of 5 …

Active • 2024-25 (T-4), 2023-24 (T-4) ...
1.07 MW
Maidenhead Road, Windsor, SL4 5GD (15 components)
• Battery Storage
• Battery storage
• Battery strorage unit
Active • 2024-25 (T-4), 2023-24 (T-4) ...
2.04 MW
Low Dyke, Calthwaite, Penrith, CA11 9PS (5 components)

The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Leighton Hall Farm, Middlewich Road, Leighton, Crewe, CW1 4QH (3 components)

10 x 2MW/2MWh containerised Energy Storage System Units to be installed on designated land at Leighton Hall Farm.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Land to West of Welkin mill, Welkin Rd, Lower Bredbury, Stockport, SK6 2BH (6 components)
• A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• A 50MW New Build Battery Storage site
Active • 2025-26 (T-4), 2024-25 (T-4) ...
31.39 MW
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (6 components)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
7.10 MW
Land to north of SPEN Drumcross GSP, Byers Brae, Bathgate EH54 8TB. See map. (13 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV

Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
Land south of Halesfield 13, Telford, TF7 4PL (2 components)

5MW of Lithium Ion battery storage and power conversion systems.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Land on the West Side of Blandford Road, Poole, BH16 6AB (3 components)

A 25MW New Build Battery Storage site

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Land on Dalmarnock Road Trading Estate, Rutherglen, G73 1AN. See map uploaded. (9 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
6.38 MW