Wearmaster House, Malthouse Lane, Hurstpierpoint, Hassocks, BN6 9LA (22 components)
• A new build 32MW battery energy storage system
• A new build 34MW battery energy storage system
• A new build 34MW battery energy storage system commissioned in July 2021
Active • 2022-23 (T-1), 2022-23 (T-3) ...
66.68 MW
The Street, Hacheston, Woodbridge, Suffolk, UK, IP13 9ND (10 components)
• A 50MW New Build Battery Storage site
• Existing 50MW Battery Storage site
Inactive • 2021-22 (T-4), 2022-23 (T-1) ...
STOR no.1 site, Ernesettle Road, PLymouth PL5 2TT (3 components)

Storage facility

Inactive • 2022-23 (T-1)
Slamseys Farm, Blackley Lane, Great Notley, CM77 7QW (24 components)
• 5MW, 1 hour/5MWh lithium-ion battery
• Slamseys is a 10MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO switch gear, Energy Management Systems and Monitoring systems.
• Slamseys is a 5MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO switch gear, Energy Management Systems and Monitoring systems.
Active • 2021-22 (T-4), 2022-23 (T-1) ...
5.32 MW
Redscar Business Park, Longridge Road, Preston, UK, PR2 5NQ (11 components)
• A 34MW New Build Battery Storage Site.
• A 49MW New Build Battery Storage Site.
• A 49MW existing Battery Storage Site.
Inactive • 2021-22 (T-4), 2022-23 (T-1) ...
10.01 MW
Plot B at Severn Road Avonmouth BS10 7SE (16 components)
• 15.000MW of Battery Energy Storage Systems
• Existing Generator Battery Energy Storage System
• New Build Battery Energy Storage Systems
Active • 2022-23 (T-1), 2024-25 (T-1) ...
7.74 MW
36.31 MW
Pen-y-Cymoedd Wind Farm, Treherbert Road, Treherbert, Treorchy. Rhondda Cynon Taf. South Wales CF42 5SX (19 components)

A new build 22 MW battery storage facility. Comprising of five containerised battery units, ten inverter banks (2 per battery container), associated 33kV transformers, switchgear and cabling.

Inactive • 2019-20 (T-1), 2020-21 (T-1) ...
7.30 MW
Oaks Business Park, Oaks Lane, Barnsley, S71 1HT (8 components)
• A 40MW New Build Battery Storage site
• A 45MWh New Build Battery Storage site
Active • 2022-23 (T-1), 2023-24 (T-1) ...
22.08 MW
Norwich East Electric Forecourt Broadland Gate Norwich NR13 5HB (12 components)

6.000MW Battery Energy Storage System to be installed at Norwich East Electric Forecourt

Active • 2022-23 (T-1), 2023-24 (T-1) ...
7.40 MW
Newlands Farm, Tanners Lane, Fareham, PO14 2HT (11 components)
• 10MW Storage
• 15MW of Battery Energy Storage Systems
• 20MW of Battery Energy Storage Systems
Active • 2022-23 (T-1), 2023-24 (T-1) ...
16.58 MW
Land West Of Mossbank Cottages, Drumcross, Bathgate, EH48 1JX (10 components)
• Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery storage units, ancillary equipment and substation building.
• Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery storage units, ancillary equipment and substation building. Substation building includes; equipment, metering room, SCADA room and 33kV switching room.
Active • 2019-20 (T-1), 2022-23 (T-1) ...
7.74 MW
Land West of Hopewell Street, Stairfoot, Barnsley, S70 3ET NEAREST (10 components)

Battery storage 40.000MW/40.000MWh one duration battery new build

Active • 2022-23 (T-1), 2023-24 (T-1) ...
29.66 MW
Land to north of SPEN Drumcross GSP, Byers Brae, Bathgate EH54 8TB. See map. (13 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV

Inactive • 2018-19 (T-1), 2021-22 (T-4) ...
Land South of NG Capenhurst Substation, Capenhurst Lane, Capenhurst, Cheshire, CH1 6HE (38 components)

4 controllable Battery BMUs located at the Capenhurst site with 2 auxiliary station load BMUs

Active • 2022-23 (T-1), 2023-24 (T-1) ...
122.37 MW
LAND ON THE SOUTH SIDE OF FAIRY LANE, SALE, M33 2JU. (14 components)

Battery Storage Plant

Active • 2022-23 (T-1), 2023-24 (T-1) ...
68.11 MW
Land off Dunsinane Avenue, Dunsinmore Industrial Estate, Dundee, Scotland, DD2 3QF (8 components)
• 49.9MW Lithium-ion Energy Storage System
• 49MW Lithium-ion Energy Storage System
Inactive • 2022-23 (T-1), 2023-24 (T-1)
31.24 MW
Land North East Of Newton Wood Farm Newtonwood Lane Newton, NEAREST DE55 5SG (10 components)

New build battery storage 50.000MW/50.000MWh one hour duration asset

Active • 2022-23 (T-1), 2023-24 (T-1) ...
37.10 MW
Land at Weirs Drove, Cambridge, CB25 0BP (11 components)
• 49.900MW/49.900MWh battery storage asset, 1 hour duration
• The CMU component at the Burwell Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 49.900MW each.
Active • 2022-23 (T-1), 2022-23 (T-4) ...
37.03 MW