Upton Lane, adjacent to Rownhams BSP Substation SO16 0XY (5 components)

10MW battery energy storage facility at Upton Lane, Rownhams (3)

Storage Battery Storage Storage (Duration 1h) GBSL NURSLING LIMITED New Build Generating CMU GBSL Nursling GBSL Nursling +1 more Conditional SO16
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Unit A ? Apex 30, 233-269 London Road, Stainess, TW18 4JU (2 components)

The CMU at Staines will be an energy storage facility with a maximum import and export capacity of 49.9MW. (2)

Storage Storage (Duration 1h) Reliagen Electric Ltd New Build Generating CMU Staines Battery Storage Facility Staines Battery Storage Facility Conditional TW18
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Tamerton Road, Roborough, A386, Plymouth PL6 7BQ (5 components)

2MW BESS (3)

Storage Storage (Duration 1h) KIWI POWER LTD Existing Generating CMU KPB001 KPB001 PL6
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
STOR no.1 site, Ernesettle Road, PLymouth PL2 5TT (4 components)

Storage facility (3)

Storage Storage (Duration 1h) IRE 001 LIMITED New Build Generating CMU KEYDT1 2MW storage KEYDT2 18MW storage +1 more PL2
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Stevens Croft Power Station, Johnstonbridge Road, Lockerbie, Dumfries & Galloway. DG11 2SQ (2 components)

A site with a 10MW, 10MWh (1C) Lithium Ion Battery system, the system will be connected to the distribution network via the same connection as a nearby biomass power station. … (2)

Storage Storage (Duration 1h) E.ON UK CHP LIMITED New Build Generating CMU Stevens Croft Battery Stevens Croft Battery Conditional DG11
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Spitfire Way, Wholeflats, Grangemouth FK3 9UB Note: This is the same location as SWGAS3. However, this site will be split, with independent connections, companies and planning permissions. We have uploaded a map to show exact location. (3 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV. (3)

Storage Storage (Duration 1h) SpectrumReserve6 Ltd. New Build Generating CMU Spitfire Way Battery Storage Facility Spitfire Way Battery Storage Facility Not Prequalified FK3
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Slamseys Farm, Blackley Lane, Great Notley, CM77 7QW (3 components)
• 5MW, 1 hour/5MWh lithium-ion battery
• Slamseys is a 10MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO switch gear, Energy Management Systems and Monitoring systems.
• Slamseys is a 5MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO switch gear, Energy Management Systems and Monitoring systems.
Storage Storage (Duration 1h) BRAINTREE ELECTRIC FORECOURT LTD New Build Generating CMU Braintree Electric Forecourt Slamseys Energy Centre +1 more CM77
Active • 2024-25 (T-4), 2022-23 (T-4) ...
Plot B at Severn Road Avonmouth BS10 7SE (3 components)
• 15.000MW of Battery Energy Storage Systems
• 15MW of Battery Energy Storage Systems
• The CMU will be formed of multiple individual Batteries. This site is to include a 17MW Battery Energy Storage System (BESS) that can either operate as import or export at will. The 17MW connection is to be provided at 33KV by installing an underground cable with a metering circuit breaker located at the customer's site.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Pen-y-Cymoedd Wind Farm, Treherbert Road, Treherbert, Treorchy. Rhondda Cynon Taf. South Wales CF42 5SX (6 components)

A new build 22 MW battery storage facility. Comprising of five containerised battery units, ten inverter banks (2 per battery container), associated 33kV transformers, switchgear and cabling. (3)

Storage Storage (Duration 1h) Storage (Duration 0.5h) VATTENFALL WIND POWER LTD Existing Generating CMU Battery@PyC Battery@PyC +1 more Rejected CF42
Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
1.30 MW
Old Gloucester Rd, Alveston, Bristol, UK, BS37 9TU (4 components)
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power. The system is connected via switch gear and a transformer to the 132kV network in WPD's West Midland region. (2)
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power. The system is connected via switch gear and a transformer to the 132kV network in WPD's West Midland region.
Storage Storage (Duration 1h) Ecotricity Generation Limited New Build Generating CMU Alveston Battery Storage Alveston Battery Storage Conditional BS37
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Nunhide Lane Theale Berkshire RG31 7SD (3 components)

A new power plant, with associated civil works, switchgear and electrical connection. (3)

Storage Storage (Duration 1h) PEAK GEN POWER 26 LIMITED New Build Generating CMU Peak Gen Power 26 Peak Gen Power 26 +1 more Conditional RG31
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Milton Court Farm, Dorking, RH4 3LY (5 components)
• 6MW battery energy storage facility at Milton Court Farm, Dorking (2)
• 5MW battery energy storage facility at Milton Court Farm, Dorking
Storage Battery Storage Storage (Duration 1h) GBSL DORKING LIMITED New Build Generating CMU GBSL Dorking GBSL Dorking +1 more RH4
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Land to the west of Old Forge Dr, Redditch B98 7SY, UK (3 components)

The CMU component at the Ipsley Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 4MW each. (3)

Storage Storage (Duration 1h) RNK Holding Ltd New Build Generating CMU Ipsley Battery Storage Facility Ipsley Battery Storage Facility Conditional B98
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land to the North of Great Wheatley Road, Rayleigh, SS6 7AR (3 components)

The CMU component at the Rayleigh Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 10.800MW each. (3)

Storage Storage (Duration 1h) SOUTH EAST GRID STORAGE TWO LTD New Build Generating CMU Rayleigh Battery Storage Facility Rayleigh Battery Storage Facility Rejected SS6
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land to the North of Bransholme Rd, Hull HU7 4YP, UK (2 components)
• The CMU component at the Bransholme Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.
• The CMU component at the Bransholme Facility will be a capacity market and load balancing facility comprised of gas turbines and will have export capacity of 20.000MW.
Storage (Duration 1h) OCGT and Reciprocating Engines (Fuel Type - Gas) NORTH EAST GRID STORAGE TWO LTD New Build Generating CMU Bransholme Battery Storage Facility Bransholme Facility Conditional HU7
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Land on the south east side of Lark's Lane, Latteridge, Iron Acton, BS37 9TX (2 components)

The CMU component at the Iron Acton Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 49.9MW each. (2)

Storage Storage (Duration 1h) SOUTH WEST GRID STORAGE TWO LTD New Build Generating CMU Iron Acton Battery Storage Facility Iron Acton Battery Storage Facility Conditional BS37
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Land on Dalmarnock Road Trading Estate, Rutherglen, G73 1AN. See map uploaded. (3 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV. (3)

Storage Storage (Duration 1h) SpectrumReserve2 Ltd New Build Generating CMU Dalmarnock Battery Storage Facility Dalmarnock Battery Storage Facility G73
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Land off Tower House Lane, Saltend, Hull, UK, HU12 8EE (2 components)

The CMU component at the Saltend Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each. (2)

Storage Storage (Duration 1h) NORTH EAST GRID STORAGE ONE LTD New Build Generating CMU Saltend Battery Storage Facility Saltend Battery Storage Facility Conditional HU12
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Land at Boscar Grange Farm, Thirsk Road, Easingwold, York, YO61 3NQ (2 components)
• A 20MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO HV switch gear, Energy Management Systems and Monitoring systems. Refer to covering letter for further details.
• A 27MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO HV switch gear, Energy Management Systems and Monitoring systems. Refer to covering letter for further details.
Storage Storage (Duration 1h) ENERGY STORE 6 LTD New Build Generating CMU York Energy Centre York Energy Centre Conditional YO61
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Land at Bankhead Farm South of Twentyfive Acre Wood, Fishcross, Clackmannanshire, FK10 3HZ (9 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (3)

Storage Storage (Duration 1h) FISHCROSS BATTERY STORAGE LIMITED New Build Generating CMU Bankhead Storage Bankhead Storage +3 more Conditional FK10
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
land adj West Melton Electricity substation Elsecar Road Brampton Bierlow, S63 6AG (3 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (3)

Storage Storage (Duration 1h) WEST MELTON BATTERY STORAGE LIMITED New Build Generating CMU West Melton Storage West Melton Storage Conditional S63
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land Adj To Electricity Sub Station Hiillhouse International Works Central Road Thornton-Cleveleys Lancashire, FY5 4QD (3 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (3)

Storage Storage (Duration 1h) HILLHOUSE BATTERY STORAGE LIMITED New Build Generating CMU Hillhouse Storage Hillhouse Storage Conditional FY5
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land adjacent to electricity sub station Stonehill Charlton Wiltshire SN16 9RP (3 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (3)

Storage Storage (Duration 1h) MINETY BATTERY STORAGE LIMITED New Build Generating CMU Minety Storage Minety Storage Conditional SN16
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Inverkeithing Battery Storage Facility (aka Broomhall Battery Storage Facility) Land off the B981 (see uploaded map) just north of Burnside Industrial Estate near Inverkeithing KY11 1HT (3 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV (3)

Storage Storage (Duration 1h) Zenobe Wishaw Limited New Build Generating CMU Inverkeithing Battery Storage Facility (aka Broomhall Battery Storage Facility) Inverkeithing Battery Storage Facility (aka Broomhall Battery Storage Facility) Not Prequalified KY11
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
High Middlefield Farm, Durham Road, Thorpe Thewles, TS21 3LS. (2 components)

Battery Storage Plant (2)

Storage Storage (Duration 1h) NORTON STORAGE LIMITED New Build Generating CMU Norton Storage 024 Norton Storage 024 TS21