Storage (Duration 1h)

5 unique locations (60 components)

Cowley Hill Works Boilerhouse, Albert Street, St Helens, WA10 2RZ (20 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
13.89 MW
Land at Model Farm, Frenchs Road, Walpole St. Andrew, Norfolk, PE14 7JE. (17 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• 2026 kW CHP unit
• N/A
Active • 2025-26 (T-4), 2022-23 (T-4) ...
Land at the corner of Hull Road and Salt End Lane, HU12 8PP (6 components)
• A generating station consisting of multiple reciprocating engines and alternators located on a single site.
• The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy Storage System (BESS) that can either operate as import or export at will. The connection is to be provided at 33KV by installing an underground cable with a metering circuit breaker located at the customer's site.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
46.54 MW
Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP (14 components)
• 20.000MW of battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP
• 20MW battery storage site
• Battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
11.16 MW
Unit A ? Apex 30, 233-269 London Road, Stainess, TW18 4JU (3 components)

The CMU at Staines will be an energy storage facility with a maximum import and export capacity of 49.9MW.

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Loading map...
Showing 5 locations