Storage (Duration 1h)

2 unique locations (4 components)

Land on the south east side of Lark's Lane, Latteridge, Iron Acton, BS37 9TX (2 components)

The CMU component at the Iron Acton Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 49.9MW each.

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Land to the North of Bransholme Rd, Hull HU7 4YP, UK (2 components)
• The CMU component at the Bransholme Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.
• The CMU component at the Bransholme Facility will be a capacity market and load balancing facility comprised of gas turbines and will have export capacity of 20.000MW.
Inactive • 2022-23 (T-4), 2021-22 (T-4)