Storage (Duration 1h)

7 unique locations (17 components)

Active MW: 8174.73 MW
Inactive MW: 278.73 MW
Thames Water Sewage Works Amersham Road Denham Buckinghamshire SL9 7AW (1 component)

A new battery storage plant, with associated civil works, switchgear and electrical connection.

Storage (Duration 1h) Field Gerrards Cross Ltd New Build Generating CMU Peak Gen Power 27 Not Prequalified SL9
Inactive • 2021-22 (T-1)
Slamseys Farm, Blackley Lane, Great Notley, CM77 7QW (5 components)

5MW, 1 hour/5MWh lithium-ion battery (3)

Storage Storage (Duration 1h) BRAINTREE ELECTRIC FORECOURT LTD New Build Generating CMU Braintree Electric Forecourt Braintree Electric Forecourt +2 more CM77
Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
0.93 MW
Millstream, Maidenhead Road, Windsor, SL45GD (2 components)

Battery storage unit (2)

Active • 2024-25 (T-4), 2021-22 (T-1)
Mill Farm Caythorpe Heath Ln Caythorpe Grantham NG32 3ER (4 components)

7 MW of Battery Storage located at Grantham. (3)

Storage Storage (Duration 1h) Limejump Virtual 1 Limited Existing Generating CMU Mill Farm MillFarm1 +2 more NG32
Inactive • 2021-22 (T-1), 2020-21 (T-1) ...
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (1 component)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 1h) PIVOTED POWER LLP New Build Generating CMU Pivot Power 1 ME10
Inactive • 2021-22 (T-1)
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (1 component)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 1h) PIVOTED POWER LLP New Build Generating CMU Pivot Power 1 OX44
Inactive • 2021-22 (T-1)
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (3 components)
• 1.2 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2MW
DSR Storage Storage (Duration 1h) LIMEJUMP LTD Existing Generating CMU KnotKirkThry WF11
Inactive • 2021-22 (T-1), 2019-20 (T-1) ...
Loading map...
Showing 7 locations