Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1h)

39 unique locations (328 components) - Page 1 of 2

Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (52 components)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
• ... and 1 more unique description
Active • 2024-25 (T-4), 2023-24 (T-4) ...
9.63 MW
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (10 components)
• 1.200 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2 MW
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (3 components)
• 1.200 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2 MW
Inactive • 2021-22 (T-1), 2019-20 (T-1) ...
Tamerton Road, Roborough, A386, Plymouth PL6 7BQ (9 components)

2MW BESS

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Sub station Percival Lane Runcorn Cheshire WA7 4DS (8 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2020-21 (T-4), 2019-20 (T-1)
Slamseys Farm, Blackley Lane, Great Notley, CM77 7QW (13 components)
• 5MW, 1 hour/5MWh lithium-ion battery
• Slamseys is a 10MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO switch gear, Energy Management Systems and Monitoring systems.
• Slamseys is a 5MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO switch gear, Energy Management Systems and Monitoring systems.
Active • 2024-25 (T-4), 2023-24 (T-1) ...
1.86 MW
Slamseys Farm, Blackley Lane, Great Notley, CM77 7QW (5 components)
• 5MW, 1 hour/5MWh lithium-ion battery
• Slamseys is a 10MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO switch gear, Energy Management Systems and Monitoring systems.
• Slamseys is a 5MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO switch gear, Energy Management Systems and Monitoring systems.
Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
0.93 MW
PROJECT SCENE ENERGY CENTRE, TRENT BASIN, TRENT LANE, SNEINTON, NOTTINGHAM, NOTTINGHAMSHIRE, NG2 4DS (6 components)
• 0.500MW Battery Energy Storage System
• 0.5MW of demand reduction
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Pen-y-Cymoedd Wind Farm, Treherbert Road, Treherbert, Treorchy. Rhondda Cynon Taf. South Wales CF42 5SX (19 components)

A new build 22 MW battery storage facility. Comprising of five containerised battery units, ten inverter banks (2 per battery container), associated 33kV transformers, switchgear and cabling.

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
2.60 MW
Old Gloucester Rd, Alveston, Bristol, UK, BS37 9TU (8 components)

This CMU is formed of a battery bank and PCS capable of providing 10MW of power. The system is connected via switch gear and a transformer to the 132kV network …

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
NORWICH ROAD INDUSTRIAL ESTATE, HALESWORTH, SUFFOLK, IP19 8QJ (7 components)
• The CMU component at Halesworth is an energy storage system comprised of batteries and will have an import and export capacity of 40MW.
• The CMU component at Halesworth is an energy storage system comprised of batteries and will have an import capacity of 40 MVA and export capacity of 40 MW.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Milton Court Farm, Dorking, RH4 3LY (13 components)
• 5MW battery energy storage facility at Milton Court Farm, Dorking
• 6MW battery energy storage facility at Milton Court Farm, Dorking
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Mill Farm Caythorpe Heath Ln Caythorpe Grantham NG32 3ER (5 components)
• 7 MW of Battery Storage loacated at Grantham.
• 7 MW of Battery Storage located at Grantham.
• Battery Storage located at Grantham.
Active • 2028-29 (T-4), 2021-22 (T-1) ...
0.50 MW
Maidenhead Road, Windsor, SL4 5GD (12 components)
• Battery Storage
• Battery storage
• Battery strorage unit
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Land West Of Mossbank Cottages, Drumcross, Bathgate, EH48 1JX (7 components)
• Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery storage units, ancillary equipment and substation building.
• Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery storage units, ancillary equipment and substation building. Substation building includes; equipment, metering room, SCADA room and 33kV switching room.
Active • 2025-26 (T-4), 2022-23 (T-4) ...
Land to the west of Old Forge Dr, Redditch B98 7SY, UK (5 components)

The CMU component at the Ipsley Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 4MW each.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land to the North of Great Wheatley Road, Rayleigh, SS6 7AR (5 components)

The CMU component at the Rayleigh Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 10.800MW each.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land South of Main Road, Bilton, Hull, HU11 4DZ (2 components)

New build Battery Energy Storage with export up to 21MW. Refer to the Covering Letter for further details.

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Land South of Main Road, Bilton, Hull, HU11 4DZ (1 component)

New build Battery Energy Storage with export up to 21MW. Refer to the Covering Letter for further details.

Inactive • 2019-20 (T-1)
Land off Sundridge Hill, Cuxton, Rochester, ME2 1LB. (13 components)
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of 49.5MVA.
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of 49.5MW.
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of 49.5MW. Battery capacity will be reduced to 38.5MWh after 15 years of operation.
• ... and 1 more unique description
Active • 2026-27 (T-4), 2025-26 (T-4) ...
22.96 MW
LAND AT TOLLGATE FARM, WELHAM GREEN, AL4 0NY (7 components)
• The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import and export capacity of 49.5MW.
• The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import capacity if 49.5 MVA and export capacity of 49.5 MW.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
LAND AT, DOLLYMANS FARM DOUBLEGATE LANE, RAWRETH, WICKFORD, SS11 8UB. (Nearest postcode to grid reference: SS11 8UA). (9 components)
• Battery Storage Plant
• Battery storage plant
• Gas Peaking Reciprocating Engine
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Land at Claredown Farm Hickford Hill Belchamp St Paul Sudbury Essex CO10 7DW (8 components)
• 20 MW of DSR
• 20 MW of demand reduction
• 20MW Battery Storage Facility located in Sudbury, Essex.
• ... and 1 more unique description
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land at Burnley Road Simonstone BB12 7ND (11 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2019-20 (T-1)
Land at Boscar Grange Farm, Thirsk Road, Easingwold, York, YO61 3NQ (4 components)
• A 20MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO HV switch gear, Energy Management Systems and Monitoring systems. Refer to covering letter for further details.
• A 27MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO HV switch gear, Energy Management Systems and Monitoring systems. Refer to covering letter for further details.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Loading map...
Showing 25 locations