Storage (Duration 1.5h)

128 unique locations (468 components) - Page 6 of 6

Active MW: 3210.97 MW
Inactive MW: 111.51 MW
Atcost Road, Barking Riverside, London, England, IG11 0EQ (1 component)

Battery energy storage system

Storage (Duration 1.5h) O&G SOLAR (SPV 52) LIMITED New Build Generating CMU Rejected IG11
Active • 2028-29 (T-4)
12.87 MW
Adjacent To St Philip's Marsh Depot, Land Off, Feeder Road, Bristol, BS2 0TH (7 components)

The CMU will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.

Storage (Duration 1h) Storage (Duration 1.5h) FEEDER GRID STORAGE LIMITED New Build Generating CMU Feeder Road Feeder Road +2 more BS2
Active • 2026-27 (T-4), 2025-26 (T-4) ...
8.35 MW
1 Barnett Wood Lane, Surrey, KT21 2BU (2 components)
• 24.5 MW BESS
• 98 MW BESS
Storage (Duration 6h) Storage (Duration 1.5h) EKU ENERGY PROJECTS (UK) LIMITED New Build Generating CMU Leatherhead Not Prequalified KT21
Active • 2029-30 (T-4), 2028-29 (T-4)
31.65 MW
Loading map...
Showing 3 locations