Storage (Duration 1.5h)

113 unique locations (353 components) - Page 5 of 5

Active MW: 3210.97 MW
Inactive MW: 111.51 MW
Camsiscan Farm, Craigie, South Ayrshire, Scotland, KA1 5JT (4 components) Geocoding Needed
β€’ An 87.500 MW Battery Storage Site Component.
β€’ An 87.500 MW New Build Battery Storage Site Component
β€’ An 87.500 MW New Build Battery Storage Site Component.
Active β€’ 2028-29 (T-4)
55.20 MW
Camilla Farm, Auchtertool, Kirkcaldy, Fife, KY2 5XW (4 components) Geocoding Needed

49.9MW Lithium-ion Energy Storage System

Active β€’ 2026-27 (T-4), 2025-26 (T-4) ...
33.77 MW
Calow Green, Calow, S44 5XQ (3 components) Geocoding Needed

A Battery Energy Storage System

Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) ADV 005 LIMITED New Build Generating CMU Calow Green Calow Green +1 more Not Prequalified S44
Active β€’ 2026-27 (T-4)
53.16 MW
Bumpers Farm, Ilmer Lane, Ilmer, Buckinghamshire, HP27 9RE (1 component) Geocoding Needed

New 49.5MW Battery Energy Storage system

Storage (Duration 1.5h) HARMONY BF2 LIMITED New Build Generating CMU HBF221 Not Prequalified HP27
Active β€’ 2025-26 (T-4)
14.82 MW
Bullo Road, Fieldhouse, Awre, GL14 1EL (6 components) Geocoding Needed
β€’ New build 1.5 hour duration battery storage
β€’ New build one-hour duration storage
Active β€’ 2026-27 (T-4), 2025-26 (T-4)
10.04 MW
Brodsworth Energy Park, Long Lands Lane, Brodsworth, Doncaster, DN6 7FF (2 components) Geocoding Needed

Battery Storage Station

Storage (Duration 1h) Storage (Duration 1.5h) ALKANE ENERGY UK LIMITED New Build Generating CMU Brodsworth Storage Brodsworth Storage DN6
Active β€’ 2027-28 (T-4), 2026-27 (T-4)
3.51 MW
Bore Tree Baulk, Grimston, Dunnington, York,YO19 5HE (3 components)

New build battery storage (3)

Storage (Duration 1.5h) UK BATTERY STORAGE LTD New Build Generating CMU York York +1 more YO19
Active β€’ 2025-26 (T-4), 2024-25 (T-1) ...
20.23 MW
Bore Tree Baulk, Grimston, Dunnington, York, YO19 5HE (3 components) Geocoding Needed

New build battery storage

Active β€’ 2025-26 (T-4), 2024-25 (T-1) ...
27.41 MW
Blandford Road, Poole, BH16 6AB (4 components) Geocoding Needed
β€’ A 25 MW Battery Storage Site
β€’ A 25MW Battery Storage Site
β€’ A 25MW New Build Battery Storage Site
Storage (Duration 2h) Storage (Duration 1.5h) EQUINOR BLANDFORD ROAD LIMITED New Build Generating CMU Poise 1 Poise 1 +1 more BH16
Active β€’ 2026-27 (T-4), 2025-26 (T-1) ...
23.04 MW
Blackford, Aberdeenshire, AB51 8YN (2 components) Geocoding Needed

A 50MW New Build Battery Storage Site

Storage (Duration 1.5h) ROTHIENORMAN FLEXPOWER LTD New Build Generating CMU Rothienorman 50 Rothienorman 50 AB51
Active β€’ 2028-29 (T-4), 2027-28 (T-4)
13.65 MW
Atcost Road, Barking Riverside, London, England, IG11 0EQ (1 component) Geocoding Needed

Battery energy storage system

Storage (Duration 1.5h) O&G SOLAR (SPV 52) LIMITED New Build Generating CMU Rejected IG11
Active β€’ 2028-29 (T-4)
12.87 MW
Adjacent To St Philip's Marsh Depot, Land Off, Feeder Road, Bristol, BS2 0TH (7 components) Geocoding Needed

The CMU will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.

Storage (Duration 1h) Storage (Duration 1.5h) FEEDER GRID STORAGE LIMITED New Build Generating CMU Feeder Road Feeder Road +2 more BS2
Active β€’ 2026-27 (T-4), 2025-26 (T-4) ...
20.22 MW
1 Barnett Wood Lane, Surrey, KT21 2BU (1 component) Geocoding Needed

98 MW BESS

Storage (Duration 1.5h) EKU ENERGY PROJECTS (UK) LIMITED New Build Generating CMU Leatherhead Not Prequalified KT21
Active β€’ 2028-29 (T-4)
15.46 MW
Loading map...
Showing 13 locations