Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1.5h)

113 unique locations (353 components) - Page 3 of 5

Active MW: 3210.97 MW
Inactive MW: 111.51 MW
Land South West of Indian Queens Sub-station, St Dennis, St Austell, Cornwall PL26 8BY (2 components) Geocoding Needed

47.5MW capacity system with 95MWh of batteries with all ancillary equipment to be installed on the Indian Queens site.

Storage (Duration 2h) Storage (Duration 1.5h) SAMBAR POWER LIMITED New Build Generating CMU Indian Queens BESS Indian Queens BESS 1 PL26
Active • 2027-28 (T-4), 2025-26 (T-1)
18.37 MW
Land south of Walpole Substation, Walpole Bank, Norfolk, PE14 7JE. (3 components) Geocoding Needed

Lithium-based battery energy storage system.

Storage (Duration 2h) Storage (Duration 1.5h) WALPOLE GREEN LIMITED New Build Generating CMU Walpole Walpole +1 more PE14
Active • 2026-27 (T-4), 2025-26 (T-1) ...
35.70 MW
LAND SOUTH OF WAKEFIELD B SUBSTATION AND EAST OF NEIL FOX WAY, WAKEFIELD, WF1 5DB (3 components) Geocoding Needed
• A new build 99.9MW battery energy storage system
• A new build battery energy storage system
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY WB (JV) LIMITED New Build Generating CMU Wakefield ESS Wakefield ESS +1 more Rejected WF1
Active • 2028-29 (T-4), 2027-28 (T-4) ...
45.77 MW
LAND SOUTH OF TUXFORD ROAD, SKEGBY, NOTTINGHAMSHIRE, NG23 6TH. (1 component) Geocoding Needed

Lithium-based battery energy storage system.

Storage (Duration 1.5h) ENSO GREEN HOLDINGS K LIMITED New Build Generating CMU HighMarnham NG23
Active • 2026-27 (T-4)
8.89 MW
Land south of Southlands Cottages, Runwell Road, Runwell, Wickford, Essex, SS11 7QH (1 component) Geocoding Needed

A 47.500 MW / 71.250 MWh battery energy storage system

Active • 2027-28 (T-4)
5.47 MW
Land south of Southlands Cottages Runwell Road Runwell Wickford Essex SS11 7QH (1 component)

A 47.500 MW / 71.250 MWh battery energy storage system

Storage (Duration 1.5h) ENSO GREEN HOLDINGS LIMITED New Build Generating CMU RAYLEIGH 2 SL Not Prequalified SS11
Active • 2027-28 (T-4)
5.47 MW
Land South of National Grid Electricity Substation, Capenhurst Lane, Capenhurst, Chester, CH66 2HD (4 components) Geocoding Needed

Standalone Battery Storage Asset

Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) NATIVE RIVER LTD New Build Generating CMU Native River Native River +1 more CH66
Active • 2026-27 (T-4), 2025-26 (T-4) ...
49.35 MW
LAND SOUTH OF GUNTHORPE ROAD, WALPOLE MARSH, WISBECH, NEAR PE14 7JH (2 components) Geocoding Needed

A 100.000 MW / 150.000 MWh battery energy storage system

Active • 2028-29 (T-4), 2027-28 (T-4)
27.29 MW
Land South East of Lawns Farm, Park Lane, Cottingham, East Riding Of Yorkshire, HU16 5SB (5 components) Geocoding Needed
• A 48MW battery energy storage system
• A 49.5MW battery energy storage system
Storage Storage (Duration 2h) Storage (Duration 1.5h) HARMONY (PW) LIMITED New Build Generating CMU PILLSWOOD PILLSWOOD +2 more HU16
Active • 2025-26 (T-4), 2024-25 (T-4) ...
80.74 MW
LAND ON CHAPEL LANE, SALISBURY HOUSE FARM, KEADBY, SCUNTHORPE, DN17 3EY (2 components) Geocoding Needed
• New Build 99.9 MW Battery Energy Storage system
• New Build Battery Energy Storage system
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY KB LIMITED New Build Generating CMU Keadby ESS Keadby ESS DN17
Active • 2027-28 (T-4), 2026-27 (T-4)
30.06 MW
land north of The Brickmakers Arms, Woburn Road, Kempston, Bedfordshire, MK43 9AB (6 components) Geocoding Needed
• A 12MW containerised Energy Storage System (lithium ion batteries) with 1.5MW of storage capacity.
• A 12MW containerised Energy Storage System (lithium ion batteries) with 2 hours of storage capacity.
Storage (Duration 2h) Storage (Duration 1.5h) GRIDSOURCE (WOBURN RD) LIMITED New Build Generating CMU Woburn Road Woburn Road +2 more MK43
Active • 2027-28 (T-4), 2026-27 (T-4) ...
15.66 MW
Land north of Coxmoor Wood, off Crondall Road, Crookham Village, Fleet, GU51 5SU (1 component) Geocoding Needed

A 46.000 MW / 69.00 MWh battery energy storage system

Storage (Duration 1.5h) ENSO GREEN HOLDINGS LIMITED New Build Generating CMU FLEET Not Prequalified GU51
Active • 2027-28 (T-4)
5.30 MW
Land north of Butterfly Lane, land surrounding Hilfield Farm and land west of Hilfield Lane, Aldenham, near WD25 8DD (1 component) Geocoding Needed

A 57.000 MW / 85.500 MWh battery energy storage system

Storage (Duration 1.5h) ENSO GREEN HOLDINGS LIMITED New Build Generating CMU ELSTREE H Rejected WD25
Active • 2027-28 (T-4)
6.57 MW
Land North East of Jamesfield Organic Centre, Newburgh, KY14 6EW (6 components) Geocoding Needed
• A new build 29MW battery energy storage system
• A new build 30MW battery energy storage system
Storage Storage (Duration 2h) Storage (Duration 1.5h) HARMONY JF LIMITED New Build Generating CMU JAMESFIELD JAMESFIELD +3 more KY14
Active • 2025-26 (T-4), 2024-25 (T-4) ...
55.69 MW
Land next to Jade Business Park and Hawthorn Pit substation Hawthorn Mine Murton SR7 9DR (1 component)

A new Battery Energy Storage system

Storage (Duration 1.5h) HARMONY MF LIMITED New Build Generating CMU Not Prequalified SR7
Active • 2025-26 (T-4)
Land Next To Bojea Farm, St Austell, PL25 5RU (2 components) Geocoding Needed
• A New Build Distribution Connected Battery Energy Storage System.
• The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters
Storage (Duration 2h) Storage (Duration 1.5h) BALANCE POWER PROJECTS LIMITED New Build Generating CMU ST AUSTELLS ST AUSTELLS PL25
Active • 2027-28 (T-4), 2026-27 (T-4)
17.52 MW
LAND EAST OF TEBWORTH, LEIGHTON BUZZARD, CENTRAL BEDFORDSHIRE, LU7 9QD. (3 components) Geocoding Needed

Lithium-based battery energy storage system

Active • 2026-27 (T-4), 2025-26 (T-1) ...
26.97 MW
Land east of Nailcote Farm, Burton Green, Berkswell, Coventry, CV7 7DE (1 component) Geocoding Needed

49.9MW lithium ion battery energy storage located at Berkswell near Coventry

Active • 2028-29 (T-4)
7.87 MW
LAND EAST OF LEDSTON SUBSTATION, LEDSTON, WEST YORKSHIRE, WF10 2AW (2 components) Geocoding Needed

New Build 25 MW Battery Energy Storage system

Storage (Duration 2h) Storage (Duration 1.5h) HARMONY LS LIMITED New Build Generating CMU Leadstone ESS Leadstone ESS Not Prequalified WF10
Active • 2027-28 (T-4), 2026-27 (T-4)
7.52 MW
LAND EAST OF HOLMFIELD LANE, CASTLEFORD, WF11 8SF (3 components) Geocoding Needed
• New Build 49.99 MW Battery Energy Storage system
• New Build Battery Energy Storage system
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY CAS LIMITED New Build Generating CMU Castleford ESS Castleford ESS +1 more Rejected WF11
Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.79 MW
Land at West Road, Trafford Park, M41 7SW (7 components) Geocoding Needed
• 3 x 2MW gas gen sets
• 8 x 2MW gas gen sets at West Road
• Battery Storage Station
Storage (Duration 1h) Storage (Duration 1.5h) ALKANE ENERGY UK LIMITED New Build Generating CMU Taylor Road Storage Taylor Road Storage +2 more M41
Active • 2026-27 (T-4), 2025-26 (T-4) ...
36.82 MW
Land At Warren Farm High Street Dunsville Doncaster DN7 4BT (1 component) Geocoding Needed

A battery energy storage system

Storage (Duration 1.5h) ENSO GREEN HOLDINGS LIMITED New Build Generating CMU FLEET BESS DN7
Active • 2028-29 (T-4)
7.49 MW
LAND AT STUDLEY FARM, ATWORTH, MELKSHAM, WILTSHIRE, SN12 8LZ. (2 components) Geocoding Needed

Lithium-based battery energy storage system.

Active • 2027-28 (T-4), 2026-27 (T-4)
16.74 MW
Land at Jamesfield Farm, Abernethy, Fife, KY14 6EW (2 components) Geocoding Needed

A new build 19MW battery energy storage system

Active • 2025-26 (T-4), 2024-25 (T-1)
10.00 MW
Loading map...
Showing 25 locations