Storage (Duration 1.5h)

3 unique locations (5 components)

Active MW: 3210.97 MW
Inactive MW: 111.51 MW
LAND EAST OF HOLMFIELD LANE, CASTLEFORD, WF11 8SF (3 components)
• New Build 49.99 MW Battery Energy Storage system
• New Build Battery Energy Storage system
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY CAS LIMITED New Build Generating CMU Castleford ESS Castleford ESS +1 more Rejected WF11
Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.79 MW
Land adjacent to Wakefield B Substation Doncaster Road Wakefield WF1 5DB (1 component)

New 99.9 MW Battery Energy Storage system

Storage (Duration 1.5h) HARMONY CAS LIMITED New Build Generating CMU Wakefield Not Prequalified WF1
Active • 2025-26 (T-4)
Loading map...
Showing 3 locations