Storage (Duration 1.5h)

1 unique locations (1 components)

Active MW: 3210.97 MW
Inactive MW: 111.51 MW
Land adjacent to Gately Moor Reservoir, Redmarshall, Stockton-on-Tees TS18 1LD (1 component) Geocoding Needed

The CMU is a PV+Storage DC coupled plant with one single interconnection point with an interconnection capacity of 40.9 MWac. Storage unit (the one participating to the pre-qualification procedure) has …

Active β€’ 2026-27 (T-4)
6.68 MW
Loading map...
Showing 1 locations