Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1.5h)

10 unique locations (35 components)

Active MW: 3210.97 MW
Inactive MW: 111.51 MW
Welbeck Landfill Site, Boundary Lane, Normanton, Wakefield, WF6 2JA (2 components)

Battery Storage Station

Storage (Duration 1h) Storage (Duration 1.5h) ALKANE ENERGY UK LIMITED New Build Generating CMU Welbeck Storage Welbeck Storage Not Prequalified WF6
Active • 2025-26 (T-4)
Unit 1b, Britannia Industrial Estate, Union Road, Bolton, BL2 2HP (5 components)

Battery Storage Station (3)

Storage (Duration 1h) Storage (Duration 1.5h) Storage (Duration 2.5h) ALKANE ENERGY UK LIMITED New Build Generating CMU Union Road Storage Union Road Storage +2 more BL2
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.88 MW
South Pargillis, Clockluine Road, Hillend, Dunfermline, KY11 7HS (1 component)

Battery storage station

Storage (Duration 1.5h) ALKANE ENERGY UK LIMITED New Build Generating CMU Balbougie Storage KY11
Active • 2027-28 (T-4)
4.84 MW
Rotherham Landfill Site, Meadowhall Road, Kimberworth, Rotherham, South Yorkshire, S61 2JN (2 components)

Battery Storage Station

Storage (Duration 1h) Storage (Duration 1.5h) ALKANE ENERGY UK LIMITED New Build Generating CMU Rotherham Storage Rotherham Storage Not Prequalified S61
Active • 2025-26 (T-4)
Redditch Generation Station, Windsor Road, Redditch, B97 6HE (11 components)
• Battery Storage Station
• Gas reciprocating engines as the generating unit.
• Gas turbine generator
Active • 2028-29 (T-4), 2027-28 (T-4) ...
114.55 MW
Levitt Hagg Landfill Site, Warmsworth, Doncaster, South Yorkshire, DN4 9RS (2 components)

Battery Storage Station

Storage (Duration 1h) Storage (Duration 1.5h) ALKANE ENERGY UK LIMITED New Build Generating CMU Levitt Hagg Storage Levitt Hagg Storage Not Prequalified DN4
Active • 2025-26 (T-4)
Land at West Road, Trafford Park, M41 7SW (7 components)
• 3 x 2MW gas gen sets
• 8 x 2MW gas gen sets at West Road
• Battery Storage Station
Storage (Duration 1h) Storage (Duration 1.5h) ALKANE ENERGY UK LIMITED New Build Generating CMU Taylor Road Storage Taylor Road Storage +2 more M41
Active • 2026-27 (T-4), 2025-26 (T-4) ...
8.12 MW
Kearsley Road, Cinder Hill, Ringley, Bolton, Greater Manchester, M26 1AH (1 component)

Battery storage station

Storage (Duration 1.5h) ALKANE ENERGY UK LIMITED New Build Generating CMU Shoreside Storage M26
Active • 2027-28 (T-4)
0.81 MW
Darrington Landfill Site, Darrington Leys, Cridling Stubbs, Knottingley, West Yorkshire, WF11 0AH (2 components)

Battery Storage Station

Storage (Duration 1h) Storage (Duration 1.5h) ALKANE ENERGY UK LIMITED New Build Generating CMU Darrington Storage Darrington Storage Not Prequalified WF11
Active • 2025-26 (T-4)
Brodsworth Energy Park, Long Lands Lane, Brodsworth, Doncaster, DN6 7FF (2 components)

Battery Storage Station

Storage (Duration 1h) Storage (Duration 1.5h) ALKANE ENERGY UK LIMITED New Build Generating CMU Brodsworth Storage Brodsworth Storage DN6
Active • 2027-28 (T-4), 2026-27 (T-4)
3.51 MW
Loading map...
Showing 10 locations