Storage (Duration 1.5h)
44 unique locations (179 components) - Page 1 of 2
Adjacent To St Philip's Marsh Depot, Land Off, Feeder Road, Bristol, BS2 0TH (12 components)
The CMU will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each. (3)
Blandford Road, Poole, BH16 6AB (5 components)
Brodsworth Energy Park, Long Lands Lane, Brodsworth, Doncaster, DN6 7FF (2 components)
Battery Storage Station (2)
Bullo Road, Fieldhouse, Awre, GL14 1EL (6 components)
Calow Green, Calow, S44 5XQ (3 components)
A Battery Energy Storage System
Camilla Farm, Auchtertool, Kirkcaldy, Fife, KY2 5XW (5 components)
49.9MW Lithium-ion Energy Storage System (3)
Elsecar Road, Brampton Bierlow, West Melton, Rotherham, S63 6LS (4 components)
New Build Battery Storage Facility (3)
Lakeside Energy Storage facility, New Road, Long Drax, Selby, North Yorkshire, Y08 8FP (2 components)
This is a 99.9MW battery storage facility connected at 132kV. (2)
Land adjacent to Gately Moor Reservoir, Redmarshall, Stockton-on-Tees TS18 1LD (1 component)
The CMU is a PV+Storage DC coupled plant with one single interconnection point with an interconnection capacity of 40.9 MWac. Storage unit (the one participating to the pre-qualification procedure) has …
LAND ADJACENT TO WORMALD GREEN SUB-STATION, STATION LANE, WORMALD GREEN, HARROGATE, HG3 3RX (3 components)
Land at Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (14 components)
A new build 49.5MW battery energy storage system (3)
Land at Harrow Lane, Bulphan, Thurrock, Essex RM14 3RE (3 components)
Lithium-based battery energy storage system. (3)
LAND AT STUDLEY FARM, ATWORTH, MELKSHAM, WILTSHIRE, SN12 8LZ. (2 components)
Lithium-based battery energy storage system. (2)
Land at West Road, Trafford Park, M41 7SW (7 components)
Battery Storage Station (3)
LAND EAST OF HOLMFIELD LANE, CASTLEFORD, WF11 8SF (5 components)
LAND EAST OF LEDSTON SUBSTATION, LEDSTON, WEST YORKSHIRE, WF10 2AW (2 components)
New Build 25 MW Battery Energy Storage system (2)
LAND EAST OF TEBWORTH, LEIGHTON BUZZARD, CENTRAL BEDFORDSHIRE, LU7 9QD. (3 components)
Lithium-based battery energy storage system (3)
Land Next To Bojea Farm, St Austell, PL25 5RU (2 components)
land north of The Brickmakers Arms, Woburn Road, Kempston, Bedfordshire, MK43 9AB (7 components)
LAND ON CHAPEL LANE, SALISBURY HOUSE FARM, KEADBY, SCUNTHORPE, DN17 3EY (2 components)
Land South of National Grid Electricity Substation, Capenhurst Lane, Capenhurst, Chester, CH66 2HD (4 components)
Standalone Battery Storage Asset (3)
LAND SOUTH OF TUXFORD ROAD, SKEGBY, NOTTINGHAMSHIRE, NG23 6TH. (1 component)
Lithium-based battery energy storage system.
LAND SOUTH OF WAKEFIELD B SUBSTATION AND EAST OF NEIL FOX WAY, WAKEFIELD, WF1 5DB (3 components)
Land south of Walpole Substation, Walpole Bank, Norfolk, PE14 7JE. (3 components)
Lithium-based battery energy storage system. (3)
LAND SOUTH WEST OF COWLEY SUBSTATION, NUNEHAM COURTENAY, OXFORD, OX44 9PA (1 component)
Lithium-based battery energy storage system.