Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1.5h)

13 unique locations (71 components)

Active MW: 3210.97 MW
Inactive MW: 111.51 MW
Bore Tree Baulk, Grimston, Dunnington, York, YO19 5HE (4 components)
• New build battery storage
• The CMU Component is an Existing Generating battery storage site.
Active • 2026-27 (T-1), 2025-26 (T-4) ...
24.74 MW
Bore Tree Baulk, Grimston, Dunnington, York,YO19 5HE (4 components)
Storage (Duration 1.5h) UK BATTERY STORAGE LTD New Build Generating CMU York York +1 more YO19
Active • 2026-27 (T-1), 2025-26 (T-4) ...
24.74 MW
Feddal Battery Storage, Land located at Feddal Estate, Braco, Dunblane, Perthshire, FK15 9RA (5 components)

New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).

Active • 2029-30 (T-4), 2027-28 (T-4) ...
8.20 MW
LAND AT STUDLEY FARM, ATWORTH, MELKSHAM, WILTSHIRE, SN12 8LZ. (3 components)

Lithium-based battery energy storage system.

Active • 2027-28 (T-4), 2026-27 (T-4) ...
32.25 MW
land north of The Brickmakers Arms, Woburn Road, Kempston, Bedfordshire, MK43 9AB (7 components)
• A 12MW containerised Energy Storage System (lithium ion batteries) with 1.5MW of storage capacity.
• A 12MW containerised Energy Storage System (lithium ion batteries) with 2 hours of storage capacity.
Storage (Duration 2h) Storage (Duration 1.5h) GRIDSOURCE (WOBURN RD) LIMITED New Build Generating CMU Woburn Road Woburn Road +2 more MK43
Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.88 MW
Land South West of Indian Queens Sub-station, St Dennis, St Austell, Cornwall PL26 8BY (3 components)
• 47.5MW capacity system with 95MWh of batteries with all ancillary equipment to be installed on the Indian Queens site.
• Battery energy storage site with 47.5MW capacity located at Indian Queens substation.
Storage (Duration 2h) Storage (Duration 1.5h) SAMBAR POWER LIMITED New Build Generating CMU Indian Queens BESS Indian Queens BESS 1 PL26
Active • 2027-28 (T-4), 2026-27 (T-1) ...
31.30 MW
Orchardbank Battery Storage, Orchard Loan, Oilfield Machinery Ltd, Orchardbank Industrial Estate, Forfar, DD8 1TD (5 components)
• This is a New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).
• This is an Existing Generation CMU with 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).
Active • 2029-30 (T-4), 2027-28 (T-4) ...
8.20 MW
Richborough Energy Park, Ramsgate Road, Sandwich, CT13 9NL (10 components)
• 35.000MW battery energy storage system
• 35.000MW battery energy storage system.
• 49.990 MW battery energy storage system
Active • 2027-28 (T-4), 2026-27 (T-4) ...
65.86 MW
136.34 MW
The Manorway, Stanford-le-Hope, SS17 9LL (9 components)
• A Battery Energy Storage System (2)
• Reciprocating engines of 6 mW.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
13.94 MW
Loading map...
Showing 13 locations