Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1.5h)

1 unique locations (4 components)

via entrance at 132 Manchester Road, Carrington, Manchester, M31 4AY (4 components)
• 247.5MW capacity system with 520MWh of batteries with all ancillary equipment to be installed on the Trafford Site.
• Palm Paper Limited operates a large paper making site in King's Lynn, Norfolk. The onsite industrial process is an energy intensive paper recycling and manufacturing plant. Palm Paper plans to shut down predetermined parts of this recycling process in response to system stress events and thereby deliver the stated load reduction capacity.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2027-28 (T-4), 2022-23 (T-3) ...
28.51 MW
Loading map...
Showing 1 locations