Worset Lane Hartlepool TS27 3BL (1 component)

The CMU is a PV+Storage DC coupled plant with one single interconnection point with an interconnection capacity of 37.5 MWac. Storage unit (the one participating to the pre-qualification procedure) has …

Active • 2025-26 (T-4)
Welkin Road, Bredbury, SK6 2BH (6 components)
• Battery Energy Storage System (2)
• A gas fuelled generating station.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
16.07 MW
via entrance at 132 Manchester Road, Carrington, Manchester, M31 4AY (4 components)
• 247.5 MW capacity system with 520MWh of batteries with all ancillary equipment to be installed on the Trafford Site.
• 247.5MW capacity system with 520MWh of batteries with all ancillary equipment to be installed on the Trafford Site.
Active • 2027-28 (T-4)
114.05 MW
Unit 5, The Bloxwich Lane Estate, Walsall, WS2 8TF (2 components)

Battery Energy Storage System (2)

Inactive • 2021-22 (T-4), 2019-20 (T-1)
Unit 2, Sentinel House, Enigma Business Park, WR14 1GL (2 components)

Battery Energy Storage System (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)
The Phoenix Centre, Beaumont Road, Banbury, OX16 1RH (1 component)

Battery Energy Storage System

Inactive • 2022-23 (T-4)
The Manorway, Stanford-leHope, SS17 9LL (5 components)
• A gas fuelled generating station (2)
• A Battery Energy Storage System
Active • 2025-26 (T-4), 2024-25 (T-1)
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS (11 components)
• A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution … (2)
• A 5MW - 5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution …
Active • 2026-27 (T-4), 2024-25 (T-4) ...
1.46 MW
Scottswood Road, Newcastle Upon Tyne, NE15 8SF (1 component)

The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters

Active • 2027-28 (T-4)
5.75 MW
17.59 MW
Rusholme Grange, Drax, YO8 8PW (4 components)
• New build 35MW Battery Energy Storage System (2)
• Lithium-ion Battery Energy Storage System
Active • 2025-26 (T-4), 2024-25 (T-1) ...
12.96 MW
Rush Green Farm, London Road, Hitchin, SG4 7PQ (2 components)
• The CMU component at Rush Green Motors is an energy storage system comprised of batteries with an import and export …
• The CMU component at Rush Green Motors is an energy storage system comprised of batteries with an import and export …
Active • 2026-27 (T-4), 2025-26 (T-4)
7.46 MW
Royle Barn Road, Rochdale, OL11 3DX (5 components)

Battery Energy Storage Site (2)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
28.13 MW
Richborough Energy Park, Ramsgate Road, Sandwich, England CT13 9NL (1 component)

New Build Battery Energy Storage System

Active • 2028-29 (T-4)
27.37 MW
Redditch Generation Station, Windsor Road, Redditch, B97 6HE (5 components)
• Gas reciprocating engines as the generating unit. (2)
• Open cycle gas turbine as the generating unit.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
68.21 MW
Potman's Lane, Battle, TN33 9BL (5 components)
• A Battery Energy Storage System (2)
• A Battery Energy Storage System, which has already PQ'd as POTM25
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (10 components)
• A New Build battery energy storage system. (2)
• An existing battery energy storage system.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
20.46 MW
Plot A, Dorehouse Industrial Estate, Handsworth, Sheffield S13 9LU (1 component)

New build battery storage facility.

Active • 2026-27 (T-4)
7.11 MW
Orchardbank Battery Storage, Orchard Loan, Oilfield Machinery Ltd, Orchardbank Industrial Estate, Forfar, DD8 1TD (3 components)
• This is a New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS). (2)
• This is an Existing Generation CMU with 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).
Active • 2027-28 (T-4), 2025-26 (T-1) ...
2.81 MW
Oaks Business Park, Oaks Lane, Barnsley, S71 1HT (5 components)
• A 40MW New Build Battery Storage site (2)
• A 45MWh New Build Battery Storage site
Active • 2025-26 (T-4), 2024-25 (T-4) ...