Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 9h)

22 unique locations (116 components)

Active MW: 5949.52 MW
Inactive MW: 0.00 MW
Three Cocked Hat Plantation Waplington Lane Allerthorpe East Riding Of Yorkshire (No post code, see cover letter) (1 component) Geocoding Needed

BESS project to be installed within a future Greener Grid Park.

Storage (Duration 9h) BALWEN LIMITED New Build Generating CMU
Active • 2027-28 (T-4)
31.13 MW
Pikevy Farm, Glenrothes, Fife, KY6 3HD (2 components)

This is a 49.9MW battery storage facility connected at 33kV. (2)

Active • 2027-28 (T-4), 2025-26 (T-1)
20.72 MW
Persley Croft, The Parkway, Aberdeen AB22 8AN (1 component)

CMU ID 23PER4, a new build battery storage CMU located at Persley Croft, The Parkway, Aberdeen AB22 8AN

Storage (Duration 9h) PERSLEY CROFT BESS LTD New Build Generating CMU Persley Croft Not Prequalified AB22
Active • 2027-28 (T-4)
9.09 MW
Land west of Sellindge Substation, Church Lane, Sellindge, Aldington, Ashford TN25 6AF (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 9h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Sellindge Not Prequalified TN25
Active • 2027-28 (T-4)
5.68 MW
Land west of Roman Camp Road, Calderwood Broxburn West Lothian EH52 5PF (1 component)

Standalone battery storage system connecting at 33kV to the Broxburn substation

Storage (Duration 9h) BROXBURN ENERGY STORAGE LIMITED New Build Generating CMU Broxburn EH52
Active • 2027-28 (T-4)
6.58 MW
Land west of Landulph Substation, Ellbridge Lane Hatt, Saltash, PL12 6NE (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 9h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Landulph PL12
Active • 2027-28 (T-4)
6.50 MW
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (5 components)
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
Storage (Duration 1h) Storage (Duration 9h) PIVOTED POWER LLP Existing Generating CMU Pivot Power 1 Pivot Power 1 +3 more ME10
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.22 MW
Land To East Of Holmston Roundabout A77T From Whitletts Roundabout To Holmston Roundabout, Ayr, South Ayrshire (1 component) Geocoding Needed

Battery storage CMU

Storage (Duration 9h) FIELD HOLMSTON LTD New Build Generating CMU Holmston
Active • 2027-28 (T-4)
9.06 MW
Land on the north side of Hickling Lane, Dunston, Norwich NR14 8PW (2 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 9h) ASHGREEN ENERGYFARM LIMITED PIVOTED POWER LLP New Build Generating CMU Norwich Pivot Norwich Yare NR14
Active • 2027-28 (T-4)
15.16 MW
Land north west of Bredbury Substation Welkin Road Bredbury, Stockport SK6 2BS (3 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

Storage (Duration 2h) Storage (Duration 9h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Bredbury Pivot Power Bredbury +1 more SK6
Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.07 MW
Land north west of Braintree Substation Braintree Road Cressing, Braintree CM77 8EZ (3 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

Storage (Duration 2h) Storage (Duration 9h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Braintree Pivot Power Braintree +1 more CM77
Active • 2027-28 (T-4), 2026-27 (T-4) ...
16.89 MW
Land East of Feckenham Substation, Astwood Lane, Feckenham B96 6HP (2 components)

New build BESS to be installed within a future Greener Grid Park. (2)

Storage (Duration 6h) Storage (Duration 9h) LOGI ENERGY LIMITED New Build Generating CMU Not Prequalified B96
Active • 2028-29 (T-4), 2027-28 (T-4)
45.92 MW
Land bounded by The Rake, Lower Jowkin Lane and Furbarn Road, Rochdale. OL11 5UT (1 component)

Rochdale (BES) Ltd is planning to install a battery storage system in an outdoor, fenced compound. Batteries will be installed in standard outdoor CATL modules with an internal racked system. …

Storage (Duration 9h) ROCHDALE (BES) LTD New Build Generating CMU Rochdale OL11
Active • 2027-28 (T-4)
8.82 MW
LAND AT STUDLEY FARM, ATWORTH, MELKSHAM, WILTSHIRE, SN12 8LZ. (2 components)

Lithium-based battery energy storage system. (2)

Active • 2027-28 (T-4), 2026-27 (T-4)
16.74 MW
Land At Drum Farm Keith Moray AB55 5NP (1 component)

Battery storage CMU

Storage (Duration 9h) FIELD DRUM FARM LTD New Build Generating CMU Drum Farm AB55
Active • 2027-28 (T-4)
9.06 MW
Land at Crown Farm, adjacent to Walpole Bank Road, Walpole, PE14 7JA (2 components)
• CMU ID 22KIN4, a new build battery storage CMU
• CMU ID 23KIN4, a new build battery storage CMU
Storage (Duration 2h) Storage (Duration 9h) TALSIE CROWN BESS LIMITED New Build Generating CMU Kings Lynn Kings Lynn Not Prequalified PE14
Active • 2027-28 (T-4), 2026-27 (T-4)
32.75 MW
High Flat Farm BESS, Adjacent to East Kilbride 33kV substation G74 4GY (1 component)

Standalone battery storage system connecting at 33kV to the East Killbride substation

Storage (Duration 9h) CATHKIN ENERGY STORAGE LIMITED New Build Generating CMU CATHKIN G74
Active • 2027-28 (T-4)
6.58 MW
Foyers Power Station, Foyers, Inverness, IV2 6YB (16 components)
• Generating Unit 1 (2)
• Generating Unit 2
Active • 2028-29 (T-4), 2027-28 (T-4) ...
852.09 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (60 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3416.01 MW
Deeside Power Station Zone 4 Weybridge Road Deeside Industrial Park Flintshire CH5 2UL (2 components)
• Gas Reciprocating Engines
• Grid Scale Battery Energy Storage.
Reciprocating engines Storage (Duration 9h) DEESIDE POWER (UK) LIMITED New Build Generating CMU DPUK_BATT1 DPUK_PEAK1 Not Prequalified CH5
Active • 2028-29 (T-4)
53.91 MW
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (7 components)
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
Storage (Duration 1h) Storage (Duration 9h) PIVOTED POWER LLP Existing Generating CMU Pivot Power 1 Pivot Power 1 +4 more OX44
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.22 MW
Loading map...
Showing 22 locations