Storage (Duration 9h)

6 unique locations (92 components)

Active MW: 5949.52 MW
Inactive MW: 0.00 MW
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (5 components)
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
Storage (Duration 1h) Storage (Duration 9h) PIVOTED POWER LLP Existing Generating CMU Pivot Power 1 Pivot Power 1 +3 more ME10
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.22 MW
Land East of Feckenham Substation, Astwood Lane, Feckenham B96 6HP (2 components)

New build BESS to be installed within a future Greener Grid Park. (2)

Storage (Duration 6h) Storage (Duration 9h) LOGI ENERGY LIMITED New Build Generating CMU Not Prequalified B96
Active • 2028-29 (T-4), 2027-28 (T-4)
45.92 MW
Foyers Power Station, Foyers, Inverness, IV2 6YB (16 components)
• Generating Unit 1 (2)
• Generating Unit 2
Active • 2028-29 (T-4), 2027-28 (T-4) ...
852.09 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (60 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3416.01 MW
Deeside Power Station Zone 4 Weybridge Road Deeside Industrial Park Flintshire CH5 2UL (2 components)
• Gas Reciprocating Engines
• Grid Scale Battery Energy Storage.
Reciprocating engines Storage (Duration 9h) DEESIDE POWER (UK) LIMITED New Build Generating CMU DPUK_BATT1 DPUK_PEAK1 Not Prequalified CH5
Active • 2028-29 (T-4)
53.91 MW
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (7 components)
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
Storage (Duration 1h) Storage (Duration 9h) PIVOTED POWER LLP Existing Generating CMU Pivot Power 1 Pivot Power 1 +4 more OX44
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.22 MW
Loading map...
Showing 6 locations