Storage (Duration 6h)

3 unique locations (146 components)

Active MW: 15220.84 MW
Inactive MW: 0.00 MW
Land East of Feckenham Substation, Astwood Lane, Feckenham B96 6HP (2 components)

New build BESS to be installed within a future Greener Grid Park. (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
45.92 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (67 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3601.39 MW
Loading map...