Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 5h)

11 unique locations (60 components)

Active MW: 7876.75 MW
Inactive MW: 0.00 MW
Thame Lane, Culham, Clifton Hampden, South Oxfordshire, Oxfordshire, England, OX14 3ES (2 components)

Battery Storage Plant

Storage (Duration 5h) CULHAM STORAGE LIMITED New Build Generating CMU Culham Storage Limited Not Prequalified OX14
Active • 2029-30 (T-4), 2028-29 (T-4)
214.86 MW
Luton Road, Chalton, Fancott, Toddington, Central Bedfordshire, England, LU5 6HT (2 components)

Battery Storage Plant

Storage (Duration 5h) Storage (Duration 8h) SUNDON STORAGE LIMITED New Build Generating CMU Sundon Storage Limited Not Prequalified LU5
Active • 2029-30 (T-4), 2028-29 (T-4)
214.39 MW
Land to Far Souracre, SK15 3DA (2 components)

Lithium ion battery storage plant

Active • 2028-29 (T-4)
31.40 MW
Land off Hogshaw Road, Granborough, Buckingham, MK18 3NL (3 components)

Battery Storage Plant

Storage (Duration 2h) Storage (Duration 5h) Storage (Duration 8h) EAST CLAYDON STORAGE LIMITED New Build Generating CMU East Claydon Storage Limited East Claydon Storage Limited Not Prequalified MK18
Active • 2029-30 (T-4), 2028-29 (T-4) ...
291.34 MW
Land off Carlisle Road (B7078), JJ's Farm, Coalburn, Lesmahagow, South Lanarkshire, ML11 0JU (7 components)
• 40MW battery storage located near to the Coalburn North 400kV substation.
• 50MW battery storage located near Coalburn North 400kV substation.
• 50MW battery storage located near to the Coalburn North 400kV substation.
Storage (Duration 4h) Storage (Duration 5h) Storage (Duration 8h) ZENOBE COALBURN LIMITED New Build Generating CMU Coalburn unit 1 Coalburn unit 2 ML11
Active • 2028-29 (T-4), 2027-28 (T-4)
145.79 MW
Land North of Bronwylfa, Adjacent to the A483, Rhostyllen, Wrexham, LL14 4LH (4 components)

A Lithium-ion Battery Storage Plant

Active • 2028-29 (T-4)
83.74 MW
Land at Pond Farm, Pond Lane, Charlton, SN16 9DS (8 components)

A Battery Energy Storage System.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
116.20 MW
LAND AND BUILDINGS AT, RIVERFORD FARM WELL BARN AND CADDAFORD, STAVERTON, TOTNES, TQ9 6AF. (Nearest postcode to grid reference: TQ11 0LA). (5 components)

Battery Storage Plant

Storage Storage (Duration 4h) Storage (Duration 5h) Abham Storage Limited New Build Generating CMU Abham Storage Abham Storage 023 +1 more TQ9
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Land adjacent Minety National Grid Substation. B4040, Nr Malmesbury, Wiltshire, SN16 9DX (2 components)
• A Battery Energy Storage System.
• A New Build Transmission Connected Battery Energy Storage System.
Storage (Duration 5h) HB411MIN LTD New Build Generating CMU Fairholme Minety 2 SN16
Active • 2028-29 (T-4)
49.72 MW
Camsiscan Farm, Craigie, South Ayrshire, Scotland, KA1 5JT (7 components)
• A 47.380 MW component of a 350 MW new-build Battery Storage Site.
• A 47.380 component of a 350 MW new-build Battery Storage Site.
• An 87.500 MW Battery Storage Site Component.
Active • 2029-30 (T-4), 2028-29 (T-4)
133.50 MW
132 Manchester Road, Carrington, Manchester, M31 4AY (18 components)
• 250MW capacity system with 500MWh of batteries with all ancillary equipment to be installed on the Trafford Power Site
• 425MW of Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• 49.5 MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
Active • 2029-30, 2027-28 ...
488.49 MW
Loading map...
Showing 11 locations