Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 5h)

12 unique locations (54 components)

104.68 MW
31.40 MW
Land off Hogshaw Road, Granborough, Buckingham, MK18 3NL (2 components)

Battery Storage Plant (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
181.63 MW
Land off Carlisle Road (B7078), JJ's Farm, Coalburn, Lesmahagow, South Lanarkshire, ML11 0JU (4 components)
• 40MW battery storage located near to the Coalburn North 400kV substation.
• 50MW battery storage located near Coalburn North 400kV substation.
• 50MW battery storage located near to the Coalburn North 400kV substation.
Active • 2028-29 (T-4), 2027-28 (T-4)
72.65 MW
Land North of Bronwylfa Adjacent to the A483 Rhostyllen Wrexham LL14 4LH (4 components)

A Lithium-ion Battery Storage Plant

Active • 2028-29 (T-4)
83.74 MW
Land at Coopers Lane, Knowsley, Liverpool L33 7TT (4 components)
• A New Build Transmission Connected Battery Energy Storage System. (2)
• A New Build Gas fuelled power plant at Kirkby substation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
32.48 MW
132 Manchester Road, Carrington, Manchester, M31 4AY (17 components)
• 49.5 MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• 5 x 4.5MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• One 4.5MW Gas Reciprocating engine with all ancillary equipment to be installed on the Trafford Power Site
Active • 2027-28 (T-4), 2025-26 (T-4) ...
93.41 MW
Loading map...
Showing 12 locations