Storage (Duration 4h)
81 unique locations (345 components) - Page 2 of 4
Land Adjacent to No 13 Westerton Road Keith, Moray, Scotland AB55 5FA (2 components)
50MW of BESS to be installed within existing Rotating Stabiliser site. (2)
land adjacent to the AYRSHIRE GRID 400KV COLLECTOR SUBSTATION, Cambelton Farm, Beech Avenue, Hunterston, West Kilbride, KA23 9QF. (4 components)
Lithium ion battery storage plant
land adjacent to the AYRSHIRE GRID 400 KV SUBSTATION, Cambelton Farm, Beech Avenue, Hunterston, West Kilbride, KA23 9QF. (4 components)
Lithium ion battery storage plant
land adjacent to the AYRSHIRE GRID 400KV SUBSTATION, Cambelton Farm, Beech Avenue, Hunterston, West Kilbride, KA23 9QF. (4 components)
Lithium ion battery storage plant
land adjacent to the FIFE GRID SERVICES FACILITY 275KV SUBSTATION, adjacent to the A876 at Kincardine, Fife, FK10 4BL. (23 components)
Lithium ion battery storage plant (2)
land adjacent to the FIFE GRID SERVICES FACILITY 275KV SUBSTATION, adjacent to the A876 at Kincardine, Fife, FK10 4BL. (22 components)
Lithium ion battery storage plant (2)
Land And Buildings Adjoining Saxilby Road Burton Fen LN1 2BE (2 components)
CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)
LAND AND BUILDINGS AT, RIVERFORD FARM WELL BARN AND CADDAFORD, STAVERTON, TOTNES, TQ9 6AF. (Nearest postcode to grid reference: TQ11 0LA). (5 components)
Battery Storage Plant (3)
Land at Exeter College Future Skills Centre, Silverdown Office Park, EX5 2LJ (2 components)
CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)
Land at Hammonds Drive, Eastbourne BN22 8QJ (1 component)
CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
Land at Pond Farm, Pond Lane, Charlton, SN16 9DS (8 components)
A Battery Energy Storage System. (3)
Land At South End of Mullacott Cross Industrial Estate, West Down EX34 8FN (2 components)
CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)
Land by Redgate House, Vicarage Lane Suffolk Wherstead IP9 2AF (2 components)
CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)
Land east of Bramford Substation, Bullen Lane, Bramford, IP8 4JH (3 components)
The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)
Land east of Gainsborough Road Bole Nottinghamshire DN22 9EY (4 components)
New-build generating CMU comprising battery storage and associated plant to be constructed adjacent to the existing West Burton B CCGT, Nottinghamshire. Metering of output is Net of auxillary load.
Land Forming Part Of Newton Road, Bovey Tracey, Newton Abbot TQ13 9DR (3 components)
CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (3)
land immediately adjacent to the existing Windyhill Electricity Grid Substation, North Of Baljaffray Road, Bearsden, East Dunbartonshire, G61 4PU. (12 components)
Lithium ion battery storage plant
Land Lying To The North Of Mardyke, South Ockenden, RM15 6AP (2 components)
CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)
Land North of Goodrest Farm, Illey Lane, Hunnington, Halesowen, B62 0JL (1 component)
New Build storage facility
Land off Carlisle Road (B7078), JJ's Farm, Coalburn, Lesmahagow, South Lanarkshire, ML11 0JU (4 components)
Land off Fishleigh Road, Roundswell Business Park, Barnstaple, EX31 3TD (3 components)
CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (3)
Land on the East Side of Ackholt Road, Aylesham, Canterbury CT3 3AJ (2 components)
CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)
Land on the North Side of Blackhorse Lane, Exeter, EX1 3FP (2 components)
CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)
Land on the North Side of Blackhorse Lane, Exeter, EX5 2FS (2 components)
CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)
LAND ON THE NORTH SIDE OF DESFORD ROAD, ENDERBY, LEICESTER, LE19 3LR (12 components)
Battery Storage Plant (3)