Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 4h)

72 unique locations (297 components) - Page 1 of 3

24a Flightway Dunkeswell Honiton EX14 4LG (7 components)

New Build Generating CMU comprising of a battery storage asset

Inactive •
adjacent to Kilmarnock South Substation KA1 3TN (8 components)

Lithium ion battery storage plant

Inactive •
adjacent to National Grid Stalybridge substation SK15 3DA (1 component)

75MW battery storage located near to the National Grid Stalybridge substation.

Inactive •
Bullen Lane, Bramford, Mid Suffolk, Suffolk, England, IP8 4JH, United Kingdom (1 component)

The proposed battery plant would consist of a number of new highly efficient battery storage units plus ancillary equipment.

Inactive •
Buxton Road BESS, Wormhill, Dove Holes, High Peak, Derbyshire, SK17 8DL (4 components)

New Build Battery Storage

Active • 2028-29 (T-4)
22.54 MW
Cirencester Solar Farm Witpit Lane Preston Cirencester GL7 5PW (To Witpit Lane entrance use GL7 5RJ) (11 components)

A 10MW/46.6MWh Battery Energy Storage System to be installed at Cirencester Solar Farm

Inactive •
Coal Aston, Dronfield, S18 3AA (4 components)
• A 45MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
37.63 MW
Dounreay, Thurso KW14 7RE (3 components)
Inactive •
Dragons Lane, Moston, Sandbach, CW11 3QH (4 components)

12 MW Connection 48 MWh Distribution unit

Inactive •
Eccles Birgham Farm TD12 4LU (3 components)
• 400MW battery storage located near to the SPT Eccles substation, split into four BMU's
• 50MW battery storage located near to the SPT Eccles substation.
• Lithium ion battery storage plant
Active • 2026-27 (T-4), 2027-28 (T-4) ...
80.76 MW
Eccles Birgham Farm, TD12 4LU (1 component)

Lithium ion battery storage plant

Inactive •
Farr & Harris Ltd, Brassey Road, Shrewsbury, SY3 7FA (4 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2025-26 (T-1), 2028-29 (T-4)
0.27 MW
Farr & Harris Ltd, Maes Y Clawdd, Maesbury Road Industrial Estate, Oswestry SY10 8NN (4 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2025-26 (T-1), 2028-29 (T-4)
0.26 MW
Farr & Harris Ltd, Unit 3, Dyffryn Industrial Estate, Pool Road, Newtown, SY16 3BD (4 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2025-26 (T-1), 2028-29 (T-4)
0.26 MW
Fibden Farm, Hampton Lovett, Droitwich, Worcestershire, WR9 0NA (3 components)

New Build Storage Facility

Active • 2028-29 (T-4)
33.39 MW
Glowhouse Power, 135 Clydesdale Place, Moss Side Industrial Estate, Leyland, PR26 7QS (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Inactive •
Heysham Road, Bootle, L30 6TU (4 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2025-26 (T-1), 2028-29 (T-4)
0.27 MW
Hollybush, Ebstree Road, Trysull, Wolverhampton, WV5 7JE United Kingdom (1 component)

BESS stand alone projec connected to 49.9MVA import/export to Penn-Wolverhampton West n2 132kV OHL (NGED). The purpose of the BESS is to provide balancing services to the local electricity grid. …

Active • 2028-29 (T-4)
7.93 MW
Loading map...
Showing 25 locations