Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 4h)

89 unique locations (366 components) - Page 1 of 4

Active MW: 21181.65 MW
Inactive MW: 126.51 MW
24a Flightway, Dunkeswell, Honiton, EX14 4LG (8 components) Geocoding Needed
• New Build CMU comprising of battery storage and associated plant
• New Build Generating CMU comprising of a battery storage asset
Active • 2024-25 (T-4), 2023-24 (T-4) ...
12.71 MW
adjacent to Kilmarnock South Substation KA1 3TN (14 components) Geocoding Needed
• 200MW battery storage located near to the SPT Kilmarnock South substation, split into two BMU's
• 200MW battery storage located near to theSPT Kilmarnock South substation, split into two BMU's
• Lithium ion battery storage plant
Active • 2026-27 (T-4), 2025-26 (T-1)
197.31 MW
adjacent to National Grid Stalybridge substation SK15 3DA (3 components) Geocoding Needed
• 150MW battery storage located near to the National Grid Stalybridge substation, split into two BMU's
• 75MW battery storage located near to the National Grid Stalybridge substation.
Storage (Duration 2h) Storage (Duration 4h) Zenobe Stalybridge Limited New Build Generating CMU Stalybridge Stalybridge Not Prequalified SK15
Active • 2027-28 (T-4), 2026-27 (T-4)
58.53 MW
Anglian Water Services Limited, Pineham, Milton Keynes, MK15 9PA (2 components) Geocoding Needed

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Storage (Duration 3h) Storage (Duration 4h) BATTERY BOX LIMITED New Build Generating CMU Not Prequalified MK15
Active • 2027-28 (T-4), 2024-25 (T-1)
0.13 MW
Birch House, Forge Lane, Moorlands Trading Estate, Saltash, PL12 6LX (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2025-26 (T-1)
0.11 MW
Birch House, Forge Lane, Moorlands Trading Estate, Saltash, PL12 6LX (2 components) Geocoding Needed

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Bullen Lane, Bramford, Mid Suffolk, Suffolk, England, IP8 4JH, United Kingdom (1 component) Geocoding Needed

The proposed battery plant would consist of a number of new highly efficient battery storage units plus ancillary equipment.

Storage (Duration 4h) CSE33 Limited New Build Generating CMU Bramford33 Rejected IP8
Active • 2027-28 (T-4)
122.81 MW
Cirencester Solar Farm Witpit Lane Preston Cirencester GL7 5PW (To Witpit Lane entrance use GL7 5RJ) (3 components)

A 10MW/46.6MWh Battery Energy Storage System to be installed at Cirencester Solar Farm (3)

Storage (Duration 4h) CIRENCESTER SOLAR FARM LTD New Build Generating CMU Cirencester Solar Farm Cirencester Solar Farm GL7
Active • 2024-25 (T-1), 2023-24 (T-1) ...
10.69 MW
Cirencester Solar Farm, Witpit Lane, Preston, Cirencester, GL7 5PW (To Witpit Lane entrance use GL7 5RJ) (4 components) Geocoding Needed

A 10MW/46.6MWh Battery Energy Storage System to be installed at Cirencester Solar Farm

Active • 2025-26 (T-4), 2024-25 (T-1) ...
17.68 MW
Coal Aston, Dronfield, S18 3AA (2 components) Geocoding Needed
• A 45MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Storage (Duration 2h) Storage (Duration 4h) ROOT-POWER (SOUTH) LIMITED New Build Generating CMU Dyche Lane Dyche Lane 2 Not Prequalified S18
Active • 2028-29 (T-4)
28.21 MW
Colton Farm Lochead Dunfermline Fife, KY 10. This address and pincode was used for grid correspondence. However, the site`s own post-code is yet to be identified. We will notify the DB as soon as it is available. Please see the cover letter for more det (4 components) Geocoding Needed
• BESS generation scheme connected to the distribution network (33kV). The generating station has got 29.9MW export and 29.9MW import.
• Solar generation scheme connected to the distribution network (33kV). The generating station has got 29.9MW export and 29.9MW import.
Active • 2026-27 (T-4)
32.89 MW
Colton Farm Lochead Dunfermline Fife, KY 10. This address and pincode was used for grid correspondence. However, the site`s own post-code is yet to be identified. We will notify the DB as soon as it is available., Please see the cover letter for more details. (5 components) Geocoding Needed
• BESS generation scheme connected to the distribution network (33kV). The generating station has got 29.9MW export and 29.9MW import.
• Solar generation scheme connected to the distribution network (33kV). The generating station has got 29.9MW export and 29.9MW import.
Active • 2026-27 (T-4), 2024-25 (T-1)
39.67 MW
Dellsome Power, Hatfield Grid Station, Dellsome Lane, Colney Heath, St. Albans, AL4 0QT (3 components) Geocoding Needed
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV network
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Storage (Duration 3h) Storage (Duration 4h) Storage (Duration 3.5h) URBAN RESERVE STORAGE LIMITED New Build Generating CMU Dellsome Power Dellsome Power +1 more AL4
Active • 2027-28 (T-4), 2025-26 (T-1) ...
5.57 MW
Dounreay, Thurso KW14 7RE (2 components) Geocoding Needed
• A 34MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
21.31 MW
Dragons Lane, Moston, Sandbach, CW11 3QH (2 components) Geocoding Needed

12 MW Connection 48 MWh Distribution unit

Storage (Duration 4h) DRAGONS LANE BATTERY STORAGE LIMITED New Build Generating CMU Dragon Lane CW11
Active • 2026-27 (T-4), 2023-24 (T-1)
12.98 MW
East Tarelgin Farm, Ayr, KA6 6NF (4 components) Geocoding Needed
• 18.5MW/74MWh of BESS to be installed within a future Greener Grid Park.
• 50MW/100MWh of BESS to be installed within a future Greener Grid Park.
• BESS to be installed within a Greener Grid Park
Active • 2028-29 (T-4), 2026-27 (T-4) ...
58.88 MW
Eccles Birgham Farm TD12 4LU (9 components) Geocoding Needed
• 50MW battery storage located near to the SPT Eccles substation
• 50MW battery storage located near to the SPT Eccles substation.
• Lithium ion battery storage plant.
Storage (Duration 2h) Storage (Duration 4h) ZENOBE ECCLES LIMITED New Build Generating CMU Blackhillock extension Eccles +4 more TD12
Active • 2027-28 (T-4), 2026-27 (T-4)
171.47 MW
Eccles Birgham Farm, TD12 4LU (2 components) Geocoding Needed
• Lithium ion battery storage plant
• Lithium ion battery storage plant.
Storage (Duration 4h) ZENOBE ECCLES LIMITED New Build Generating CMU Kilmarnock South unit 1 Kilmarnock South unit 2 TD12
Active • 2027-28 (T-4)
30.78 MW
Eccles Birgham Farm, TD12 4LU. (1 component) Geocoding Needed

Lithium ion battery storage plant.

Storage (Duration 4h) ZENOBE ECCLES LIMITED New Build Generating CMU Kilmarnock South unit 3 TD12
Active • 2027-28 (T-4)
15.39 MW
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (45 components) Geocoding Needed
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 7)
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station
• New build gas-fired generation at Eggborough power station.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
11967.48 MW
Farr & Harris Ltd, Brassey Road, Shrewsbury, SY3 7FA (2 components) Geocoding Needed

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Farr & Harris Ltd, Maes Y Clawdd, Maesbury Road Industrial Estate, Oswestry SY10 8NN (2 components) Geocoding Needed

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Farr & Harris Ltd, Unit 3, Dyffryn Industrial Estate, Pool Road, Newtown, SY16 3BD (2 components) Geocoding Needed

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Fibden Farm, Hampton Lovett, Droitwich, Worcestershire, WR9 0NA (1 component) Geocoding Needed

New Build Storage Facility

Storage (Duration 4h) GRENERGY RENEWABLES UK LIMITED New Build Generating CMU GR - Fibden Farm Not Prequalified WR9
Active • 2028-29 (T-4)
16.70 MW
Loading map...
Showing 25 locations