Storage (Duration 4h)

1 unique locations (16 components)

Active MW: 0.00 MW
Inactive MW: 0.00 MW
Netherton Farm, Keith AB55 5PE (16 components)
β€’ 200MW battery storage located near to the National Grid Blackhillock substation, split into four BMU's
β€’ 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's
β€’ 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's.
Storage (Duration 2h) Storage (Duration 4h) ZENOBE BLACKHILLOCK LIMITED New Build Generating CMU Blackhillock Blackhillock +2 more AB55
Active β€’ 2029-30 (T-4), 2026-27 (T-4) ...
194.43 MW