20 unique locations (150 components)

Active MW: 0.00 MW
Inactive MW: 0.00 MW
Unity Farm, Brampton, CA8 1QZ (2 components)

Diesel powered generation aggregating to 6MW output at Brampton in Cumbria. Output is net of auxiliary load.

Storage (Duration 4h) Prime Energy Limited Existing Generating CMU Brampton6MW CA8
Active • 2029-30 (T-4), 2017-18 (T-1)
1.32 MW
Unit 1 Guildford Road Industrial Estate Hayle TR27 4QZ (4 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2029-30 (T-4), 2028-29 (T-4) ...
0.31 MW
Station Rd, Clowne, Chesterfield S43 4AB (4 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2029-30 (T-4), 2028-29 (T-4) ...
0.31 MW
Spring Lane, Gedling, Nottinghamshire, NG4 4PD (2 components)

New Build Storage Facility

Storage (Duration 4h) GRENERGY RENEWABLES UK LIMITED New Build Generating CMU GR - Spring Lane Not Prequalified NG4
Active • 2029-30 (T-4), 2028-29 (T-4)
77.13 MW
Sewage Treatment Works, Stephenson Road, Colchester Business Park, CO4 9AD (4 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2029-30 (T-4), 2028-29 (T-4) ...
0.31 MW
Scalm Park, Wistow Common, Selby, Yorkshire, YO8 3RD (2 components)

New Build Battery Storage Facility

Storage (Duration 4h) GRENERGY RENEWABLES UK LIMITED New Build Generating CMU GR - Scalm Park Not Prequalified YO8
Active • 2029-30 (T-4), 2028-29 (T-4)
34.28 MW
Netherton Farm, Keith AB55 5PE (16 components)
• 200MW battery storage located near to the National Grid Blackhillock substation, split into four BMU's
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's.
Storage (Duration 2h) Storage (Duration 4h) ZENOBE BLACKHILLOCK LIMITED New Build Generating CMU Blackhillock Blackhillock +2 more AB55
Active • 2029-30 (T-4), 2026-27 (T-4) ...
194.43 MW
Land North of Goodrest Farm, Illey Lane, Hunnington, Halesowen, B62 0JL (2 components)

New Build storage facility

Storage (Duration 4h) GRENERGY RENEWABLES UK LIMITED New Build Generating CMU GR - Goodrest Farm Not Prequalified B62
Active • 2029-30 (T-4), 2028-29 (T-4)
59.99 MW
Land near School Lane, Sittingbourne, ME9 8QG (3 components)

Battery Storage

Active • 2029-30 (T-4), 2028-29 (T-4) ...
33.31 MW
Land by Redgate House, Vicarage Lane Suffolk Wherstead IP9 2AF (4 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2029-30 (T-4), 2028-29 (T-4) ...
0.31 MW
Hollybush, Ebstree Road, Trysull, Wolverhampton, WV5 7JE, United Kingdom (2 components)
• BESS stand alone projec connected to 49.9MVA import/export to Penn-Wolverhampton West n2 132kV OHL (NGED). The purpose of the BESS is to provide balancing services to the local electricity grid. The BESS containers will be located outdoors and will contain the following elements: 132/33kV Switchyard, SKID Solution (Inverter + Transformer),Customer Switchroom, Customer Control Building, Customer Store Building, Auxiliary Transformer, DNO Meeting Room, DNO Control Building, DNO Store Building, Underground Cabling, Fencing, Access Track, Proposed Hedgerow Planting, 2.4 x 55m / 86.9m visibility splay to a 1m offset, Hardstanding, Parking facilities.
• Li-BESS project connected to 49.9MVA import/export at Penn-Wolverhampton West n2 132kV OHL (NGED). The purpose of the BESS is to provide frequency and balancing services to the local electricity grid.
Active • 2029-30 (T-4), 2028-29 (T-4)
16.28 MW
Fibden Farm, Hampton Lovett, Droitwich, Worcestershire, WR9 0NA (2 components)

New Build Storage Facility

Storage (Duration 4h) GRENERGY RENEWABLES UK LIMITED New Build Generating CMU GR - Fibden Farm Not Prequalified WR9
Active • 2029-30 (T-4), 2028-29 (T-4)
34.28 MW
Felindre Pumping Station Substation, Pant Lasau Road, Llangyfelach, Morriston, SA5 7PA (3 components)
• 16MW/32MWh BESS on a future Greener Grid Park.
• Battery in Greener Grid Park
• Swansea Greener Grid Park is a pioneering BESS project to the west of Rhydypandy Road, Morriston that will help achieve zero carbon emissions in Wales by increasing the stability of the electricity grid and the amount of renewable energy being delivered to the grid network.
Active • 2029-30 (T-4), 2025-26 (T-4)
39.23 MW
Farr & Harris Ltd, Unit 3, Dyffryn Industrial Estate, Pool Road, Newtown, SY16 3BD (4 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2029-30 (T-4), 2028-29 (T-4) ...
0.31 MW
Farr & Harris Ltd, Maes Y Clawdd, Maesbury Road Industrial Estate, Oswestry SY10 8NN (4 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2029-30 (T-4), 2028-29 (T-4) ...
0.30 MW
Farr & Harris Ltd, Brassey Road, Shrewsbury, SY3 7FA (4 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2029-30 (T-4), 2028-29 (T-4) ...
0.31 MW
East Tarelgin Farm, Ayr, KA6 6NF (6 components)
• 18.5MW/74MWh of BESS to be installed within a future Greener Grid Park.
• 50MW/100MWh of BESS to be installed within a future Greener Grid Park.
• BESS project to be installed within a Greener Grids Park
Active • 2029-30 (T-4), 2028-29 (T-4) ...
85.72 MW
Dunbar BESS, Dunbar, East Lothian, EH42 1RG, Scotland, UK (2 components)

Total Connection capacity of 49.99MW for Energy Storage. The component will be LFP BESS.

Storage (Duration 2h) Storage (Duration 4h) FRV POWERTEK LIMITED New Build Generating CMU FPL Dunbar BESS EH42
Active • 2029-30 (T-4), 2028-29 (T-4)
11.46 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (77 components)
• BM Unit T_DINO-1 at Dinorwig Power Station
• BM Unit T_DINO-2 at Dinorwig Power Station
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Hydro)
Active • 2029-30 (T-4), 2028-29 (T-4) ...
4515.20 MW
Birch House, Forge Lane, Moorlands Trading Estate, Saltash, PL12 6LX (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2029-30 (T-4), 2028-29 (T-4) ...
0.22 MW