Storage (Duration 4h)

38 unique locations (132 components) - Page 1 of 2

Wadsworth Farm, Toronto, Bishop Auckland DL14 7RL (4 components)
• A 50MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
62.68 MW
Unit 1 Guildford Road Industrial Estate Hayle TR27 4QZ (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Unit 1-2, Merrivale Road, Exeter Road Industrial Estate, Okehampton, EX20 1UD (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.27 MW
Tyrant Farm, Treowen, Newbridge, Newport, NP11 3BS (2 components)

New Build Battery Storage Facility

Active • 2028-29 (T-4)
10.44 MW
Two Parcels Of Land Lying To The North West And South West Of Farm Road, Brackley NN13 7EB (4 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.31 MW
Tillingdown Lane, Caterham, CR3 7JA (4 components)
• A 12MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
15.04 MW
Thorpe Marsh Ash Fields Ash Fields Road off Marsh Lane Thorpe in Balne/Barnby Dun Doncaster DN6 0EA (10 components)

New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.

Active • 2028-29 (T-4)
584.36 MW
Thornton Greener Grid Park, Thornton, Melbourne, York, YO42 4RZ (5 components)

BESS project to be installed within a future Greener Grid Park.

Active • 2028-29 (T-4), 2025-26 (T-1)
55.01 MW
Station Rd, Clowne, Chesterfield S43 4AB (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.27 MW
Spring Lane, Gedling, Nottinghamshire, NG4 4PD (2 components)

New Build Storage Facility

Active • 2028-29 (T-4)
75.13 MW
Sewage Treatment Works, Stephenson Road, Colchester Business Park, CO4 9AD (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.27 MW
Sewage Pumping Station, Rushbottom Lane, Benfleet SS7 4LW (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.27 MW
Sergeantlaw Farm, Sergeantlaw Road, Paisley, Renfrewshire PA2 8UY (4 components)

BESS project to be installed within a future Greener Grid Park.

Active • 2028-29 (T-4)
729.20 MW
Selby, North Yorkshire, YO8 6PG (3 components)
• A 40MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
33.45 MW
Scalm Park, Wistow Common, Selby, Yorkshire, YO8 3RD (3 components)

New Build Battery Storage Facility

Active • 2028-29 (T-4)
50.09 MW
Persley Croft, The Parkway, Aberdeen, AB22 8AN (2 components)

The proposed BESS has a capacity of up to 49.9 megawatts (MW) The proposals are likely to consist of: ? 30No. battery storage cubes ? 14No. inverters; ? 7No. transformers; …

Active • 2028-29 (T-4)
39.57 MW
Part Of Franklin Hodge Building, Ramsden Road, Rotherwas Industrial Estate, HR2 6LR (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.27 MW
Off Bonnington Walk, Lockleaze, Bristol, BS7 9XF (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.27 MW
Land on the North Side of Blackhorse Lane, Exeter, EX5 2FS (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.27 MW
Land on the East Side of Ackholt Road, Aylesham, Canterbury CT3 3AJ (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Land off Fishleigh Road, Roundswell Business Park, Barnstaple, EX31 3TD (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2024-25 (T-1)
0.59 MW
Land Lying To The North Of Mardyke, South Ockenden, RM15 6AP (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.26 MW
Land Forming Part Of Newton Road, Bovey Tracey, Newton Abbot TQ13 9DR (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2024-25 (T-1)
0.14 MW
Land east of Gainsborough Road Bole Nottinghamshire DN22 9EY (4 components)

New-build generating CMU comprising battery storage and associated plant to be constructed adjacent to the existing West Burton B CCGT, Nottinghamshire. Metering of output is Net of auxillary load.

Active • 2028-29 (T-4)
208.70 MW