Storage (Duration 4h)

32 unique locations (252 components) - Page 1 of 2

Active MW: 0.00 MW
Inactive MW: 0.00 MW
West Marsh Road, Spalding, Lincolnshire, PE11 3BB (20 components)
• A CCGT station consisting of two General Electric 9FA+e gas turbines with two VOGT-NEM heat recovery steam generators and one Hitachi steam turbine and is based near Spalding in Lincolnshire. Each turbine is individually metered with output being the total of all three turbines net of any auxillary load. (2)
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxiliary load.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
867.73 MW
Verge off Fingle Drive, Nr Grafton Street, Stonebridge, MK13 0DX (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2026-27
0.11 MW
Unit 1 Guildford Road Industrial Estate Hayle TR27 4QZ (4 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2029-30 (T-4), 2028-29 (T-4) ...
0.31 MW
Unit 1-2, Merrivale Road, Exeter Road Industrial Estate, Okehampton, EX20 1UD (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2028-29 (T-4), 2026-27 (T-1) ...
0.26 MW
Three Cocked Hat Plantation Waplington Lane Allerthorpe East Riding Of Yorkshire (No post code, see cover letter) (3 components) Geocoding Needed

BESS project to be installed within a future Greener Grid Park.

Active • 2027-28 (T-4), 2026-27 (T-4) ...
104.10 MW
Station Rd, Clowne, Chesterfield S43 4AB (4 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2029-30 (T-4), 2028-29 (T-4) ...
0.31 MW
Site K2, Sywell Road, Park Farm Industrial Estate, Wellingborough, NN8 6AH (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2026-27
0.11 MW
Sewage Treatment Works, Stephenson Road, Colchester Business Park, CO4 9AD (4 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2029-30 (T-4), 2028-29 (T-4) ...
0.31 MW
Sergeantlaw Farm, Sergeantlaw Road, Paisley, Renfrewshire PA2 8UY (7 components)
• 50MW of BESS to be installed within a future Greener Grid Park.
• BESS project to be installed within a future Greener Grid Park.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
308.46 MW
School Power, Rochester Road, Wouldham, Rochester, ME1 3TS (5 components)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV network
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Active • 2027-28 (T-4), 2026-27 (T-4) ...
9.11 MW
Newton Farm Newton South Queensferry West Lothian, It is to be noted that for Grid Connection correspondence post code of EH30 9SN was used. However, the project site`s post code is yet to be identified. We will notify the DB as soon as the exact post code is available. (6 components)
• BESS generation scheme connected to the distribution network (33kV). The generating station has got 29.9MW export and 20MW import
• Solar photovoltaic generation scheme connected to the distribution network
• bess photovoltaic generation scheme connected to the distribution network (33kV). 29.9MW export and 20MW import
Active • 2027-28 (T-4), 2026-27 (T-4)
37.87 MW
Netherton Farm, Keith AB55 5PE (16 components)
• 200MW battery storage located near to the National Grid Blackhillock substation, split into four BMU's
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's.
Storage (Duration 2h) Storage (Duration 4h) ZENOBE BLACKHILLOCK LIMITED New Build Generating CMU Blackhillock Blackhillock +2 more AB55
Active • 2029-30 (T-4), 2026-27 (T-4) ...
194.43 MW
Land on the East Side of Ackholt Road, Aylesham, Canterbury CT3 3AJ (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2026-27 (T-1) ...
0.25 MW
Land east of Bramford Substation, Bullen Lane, Bramford, IP8 4JH (3 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 2h) Storage (Duration 4h) DAMSONGREEN ENERGYFARM LIMITED New Build Generating CMU Pivot Power Bramford Pivot Power Bramford +1 more IP8
Active • 2026-27 (T-4), 2025-26 (T-1) ...
35.45 MW
Land by Redgate House, Vicarage Lane Suffolk Wherstead IP9 2AF (4 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2029-30 (T-4), 2028-29 (T-4) ...
0.31 MW
Land at Pond Farm, Pond Lane, Charlton, SN16 9DS (8 components)

A Battery Energy Storage System.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
116.20 MW
Farr & Harris Ltd, Unit 3, Dyffryn Industrial Estate, Pool Road, Newtown, SY16 3BD (4 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2029-30 (T-4), 2028-29 (T-4) ...
0.31 MW
Farr & Harris Ltd, Maes Y Clawdd, Maesbury Road Industrial Estate, Oswestry SY10 8NN (4 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2029-30 (T-4), 2028-29 (T-4) ...
0.30 MW
Farr & Harris Ltd, Brassey Road, Shrewsbury, SY3 7FA (4 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2029-30 (T-4), 2028-29 (T-4) ...
0.31 MW
Loading map...
Showing 25 locations