Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 4h)

6 unique locations (57 components)

Active MW: 0.00 MW
Inactive MW: 0.00 MW
West Marsh Road, Spalding, Lincolnshire, PE11 3BB (20 components)
β€’ A CCGT station consisting of two General Electric 9FA+e gas turbines with two VOGT-NEM heat recovery steam generators and one Hitachi steam turbine and is based near Spalding in Lincolnshire. Each turbine is individually metered with output being the total of all three turbines net of any auxillary load. (2)
β€’ A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxiliary load.
Active β€’ 2026-27 (T-4), 2025-26 (T-4) ...
867.73 MW
Sergeantlaw Farm, Sergeantlaw Road, Paisley, Renfrewshire PA2 8UY (7 components)
β€’ 50MW of BESS to be installed within a future Greener Grid Park.
β€’ BESS project to be installed within a future Greener Grid Park.
Active β€’ 2028-29 (T-4), 2026-27 (T-4) ...
308.46 MW
Land on the North Side of Desford Road, Enderby, Leicester, LE19 3LR (12 components)

Battery Storage Plant

Active β€’ 2025-26 (T-4), 2024-25 (T-4) ...
28.96 MW
Felindre Pumping Station Substation, Pant Lasau Road, Llangyfelach, Morriston, SA5 7PA (3 components)
β€’ 16MW/32MWh BESS on a future Greener Grid Park.
β€’ Battery in Greener Grid Park
β€’ Swansea Greener Grid Park is a pioneering BESS project to the west of Rhydypandy Road, Morriston that will help achieve zero carbon emissions in Wales by increasing the stability of the electricity grid and the amount of renewable energy being delivered to the grid network.
Active β€’ 2029-30 (T-4), 2025-26 (T-4)
39.23 MW
Cirencester Solar Farm, Witpit Lane, Preston, Cirencester, GL7 5PW (To Witpit Lane entrance use GL7 5RJ) (4 components)

A 10MW/46.6MWh Battery Energy Storage System to be installed at Cirencester Solar Farm

Storage (Duration 4h) CIRENCESTER SOLAR FARM LTD Cirencester Solar Farm Cirencester Solar Farm GL7
Active β€’ 2025-26 (T-4), 2024-25 (T-1) ...
10.69 MW
Loading map...
Showing 6 locations