Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 3h)

17 unique locations (67 components)

Active MW: 702.22 MW
Inactive MW: 0.00 MW
Land to the south of National Grid's Rainhill Substation, Lea Green Road, Rainhill, WA9 4QD (9 components)

New Build transmission connected Battery Storage site on land Adjacent to National Grid's Rainhill Substation

Active • 2029-30 (T-4), 2028-29 (T-4) ...
119.78 MW
Land to the south of National Grid's Rainhill Substation, Lea Green Road, Rainhill, WA9 4QD (9 components)
• Battery Project on Greenfield Site
• Battery Project on greenfield site
• Battery Storage site at greenfield project.
Active • 2029-30 (T-4), 2028-29 (T-4) ...
119.78 MW
Land off Fishleigh Road, Roundswell Business Park, Barnstaple, EX31 3TD (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.19 MW
Land Forming Part Of Newton Road, Bovey Tracey, Newton Abbot TQ13 9DR (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.19 MW
Land at Smith Road, Wednesbury, WS10 0PD (2 components)
• New build generating battery storage unit.
• New build generating storage unit
Active • 2028-29 (T-4)
48.64 MW
Land at Enterprise Court Geddington Rd, Geddington, Corby, NN18 8ES (2 components)

Battery energy storage unit

Active • 2028-29 (T-4), 2025-26 (T-1)
0.68 MW
Land at Common Side Lane, Featherstone, WF7 5DF (2 components)

Battery energy storage unit

Active • 2028-29 (T-4), 2025-26 (T-1)
0.69 MW
Fulwood Road (North), Fulwood Industrial Park, Ashfield, Nottinghamshire, NG17 2NB (2 components)

Battery energy storage unit

Active • 2028-29 (T-4), 2025-26 (T-1)
0.69 MW
Former Sanmex Site, Land at Dalmarnock Road, Rutherglen, South Lanarkshire, G73 1NY (4 components)
• New Build Battery Storage
• New build battery Storage
Active • 2029-30 (T-4), 2028-29 (T-4) ...
39.12 MW
Former Cascade Works, Wellington Road, Burton Upon Trent, DE14 2AP (2 components)

Battery energy storage unit

Active • 2028-29 (T-4), 2025-26 (T-1)
0.69 MW
East Tarelgin Farm, Ayr, KA6 6NF (6 components)
• 18.5MW/74MWh of BESS to be installed within a future Greener Grid Park.
• 50MW/100MWh of BESS to be installed within a future Greener Grid Park.
• BESS project to be installed within a Greener Grids Park
Active • 2029-30 (T-4), 2028-29 (T-4) ...
85.72 MW
Common Lane, Wath upon Dearne, Rotherham, South Yorkshire, S63 7DX (4 components)
• Battery energy storage unit
• New reciprocating genset in acoustic enclosure
Reciprocating engines Storage (Duration 3h) FRP MERCIA HOLDCO LIMITED New Build Generating CMU Common Lane Common Lane S63
Active • 2028-29 (T-4), 2025-26 (T-1) ...
0.69 MW
Calow Green, Calow, North East Derbyshire, S44 5XQ (9 components)

A stand alone Battery Energy Storage System.

Active • 2029-30 (T-4), 2028-29 (T-4) ...
63.35 MW
Albion Close, Worksop, S80 1RA (2 components)

Battery energy storage unit

Active • 2028-29 (T-4), 2025-26 (T-1)
0.68 MW
5 Foxwood Rd, Chesterfield, S41 9RA (2 components)

Battery energy storage unit

Storage (Duration 3h) POWERTREE (HOLDINGS) LIMITED New Build Generating CMU Sidings Foxwood 1MW BESS S41
Active • 2028-29 (T-4), 2025-26 (T-1)
0.69 MW
4 Sidings Rd, Kirkby in Ashfield, Nottingham NG17 7JZ (2 components)

Battery energy storage unit

Storage (Duration 3h) POWERTREE (HOLDINGS) LIMITED New Build Generating CMU Sidings Foxwood 1MW BESS NG17
Active • 2028-29 (T-4), 2025-26 (T-1)
0.69 MW
Loading map...
Showing 17 locations