Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 3h)

16 unique locations (169 components)

4 Sidings Rd, Kirkby in Ashfield, Nottingham NG17 7JZ (4 components)

Battery energy storage unit

Active • 2028-29 (T-4), 2025-26 (T-1)
1.37 MW
5 Foxwood Rd, Chesterfield, S41 9RA (3 components)

Battery energy storage unit

Active • 2028-29 (T-4), 2025-26 (T-1)
1.07 MW
Albion Close, Worksop, S80 1RA (2 components)

Battery energy storage unit

Active • 2028-29 (T-4), 2025-26 (T-1)
0.68 MW
Common Lane, Wath upon Dearne, Rotherham, South Yorkshire, S63 7DX (7 components)
• Battery energy storage unit
• New reciprocating genset in acoustic enclosure
Active • 2028-29 (T-4), 2025-26 (T-1) ...
0.69 MW
Didcot OCGT Power Station Didcot Oxfordshire OX11 7HA (71 components)
• Didcot 1 OCGT - Power factor used for conversion of kVA to MW is 1 Fuel type is distillate MSID: 4032
• Didcot 2 OCGT - Power factor used for conversion of kVA to MW is 1 . Fuel type is distillate MSID: 4032
• Didcot 4 OCGT - Power factor used for conversion of kVA to MW is 1 Fuel type is distillate MSID: 4032
Active • 2028-29 (T-4), 2027-28 (T-4) ...
565.82 MW
East Tarelgin Farm, Ayr, KA6 6NF (4 components)
• 50MW/100MWh of BESS to be installed within a future Greener Grid Park.
• BESS to be installed within a Greener Grid Park
Active • 2028-29 (T-4), 2025-26 (T-4)
74.41 MW
Former Cascade Works, Wellington Road, Burton Upon Trent, DE14 2AP (4 components)

Battery energy storage unit

Active • 2028-29 (T-4), 2025-26 (T-1)
1.37 MW
1.37 MW
Furniss & White, 17 Abbey Way, North Anston Trading Estate, North Anston, Sheffield, S25 4JL (24 components)
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
20.91 MW
Hem Heath Sir Stanley Matthews Way Trentham Lakes Trentham Stoke on Trent ST4 8GR (5 components)
• Gas reciprocating engines
• N/A
• New Build Generating CMU comprising of a battery storage asset
Active • 2028-29 (T-4), 2022-23 (T-4) ...
3.54 MW
Land at Common Side Lane, Featherstone, WF7 5DF (2 components)

Battery energy storage unit

Active • 2028-29 (T-4), 2025-26 (T-1)
0.69 MW
Land at Enterprise Court Geddington Rd, Geddington, Corby, NN18 8ES (4 components)

Battery energy storage unit

Active • 2028-29 (T-4), 2025-26 (T-1)
1.90 MW
Land at Smith Road, Wednesbury, WS10 0PD (2 components)
• New build generating battery storage unit.
• New build generating storage unit
Active • 2028-29 (T-4)
48.64 MW
Land To The North Of 3 Haywood Way Hastings, TN35 4NR (8 components)
• CMU consisting of multiple reciprocating engines and alternators
• CMU consisting of multiple reciprocating engines and alternators.
• New Build Generating CMU comprising of a battery storage asset
Active • 2028-29 (T-4), 2026-27 (T-4) ...
33.52 MW
Land to the south of National Grid's Rainhill Substation, Lea Green Road, Rainhill, WA9 4QD (7 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Battery Project on Greenfield Site
• New Build transmission connected Battery Storage site on land Adjacent to National Grid's Rainhill Substation
Active • 2028-29 (T-4), 2024-25 (T-1) ...
48.57 MW
Leek STW, Off Cheddleton Rd, Leekbrook, Leek, ST13 7AU (18 components)
• Kendoon hydro power station - Unit 2, part of the Galloway hydroelectric scheme
• Load reduction on site supported by non-exporting standby generation.
• One 2MW gas CHP engine in a horticultural environment
Active • 2028-29 (T-4), 2027-28 (T-4) ...
23.75 MW
Loading map...
Showing 16 locations