Storage (Duration 3.5h)

2 unique locations (6 components)

Active MW: 164.81 MW
Inactive MW: 0.00 MW
Sergeantlaw Farm, Sergeantlaw Road, Paisley, Renfrewshire, PA2 8UY (5 components)
• 50MW of BESS to be installed within a future Greener Grid Park.
• BESS project to be installed within a future Greener Grid Park.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
59.93 MW
Land south of Inglis Farm, Cockenzie, East Lothian, EH32 0JT. (1 component)

New build battery energy storage unit.

Storage (Duration 3.5h) COCKENZIE STORAGE LIMITED New Build Generating CMU Not Prequalified EH32
Active • 2028-29 (T-4)
36.57 MW