Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

513 unique locations (1469 components) - Page 19 of 21

Active MW: 19772.39 MW
Inactive MW: 213.61 MW
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (8 components)

A new build 49.5MW battery energy storage system (3)

Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) HARMONY CTF LIMITED New Build Generating CMU CLAY TYE FARM CLAY TYE FARM +4 more Not Prequalified RM14
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Claire Court, Rotherham - former Prince of Wales Power Station, Rotherham, South Yorkshire, S60 1RU (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Rotherham Not Prequalified S60
Active • 2027-28 (T-4)
4.18 MW
Church Road, Chelmsford, CM2 8UN (1 component)

This CMU component represents the BESS system of a co-located (solar and storage) site

Storage (Duration 2h) LOW CARBON UK SOLAR OPERATIONS LIMITED New Build Generating CMU Sandon Brook BESS CM2
Active • 2027-28 (T-4)
3.72 MW
Chinley House Farm, Dolly Lane, High Peak, Stockport, SK23 7NP (1 component)

A Battery Energy Storage System

Storage (Duration 2h) ETP-QQR ENERGY LIMITED New Build Generating CMU Chinley Farm Not Prequalified SK23
Active • 2025-26 (T-4)
Childerley Farm, Dry Drayton, Cambridgeshire, United Kingdom, CB23 8BA (1 component)

New build BESS alongside new build solar farm.

Storage (Duration 2h) STARGOOSE CLEAN ENERGY LIMITED New Build Generating CMU Not Prequalified CB23
Active • 2028-29 (T-4)
6.20 MW
Chesterfield Road, Swallownest, Sheffield, S26 4SX (2 components)
• Gas fired reciprocating engines
• New Build Generating CMU comprising of battery storage and associated plant.
Storage (Duration 2h) OCGT and Reciprocating Engines (Fuel Type - Gas) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Chesterfield Chesterfield Road Not Prequalified S26
Active • 2026-27 (T-4), 2021-22 (T-4)
2.84 MW
Chesterfield Road, Sheffield, West Yorkshire, S26 4XB (2 components)

New Build CMU comprising of battery storage and associated plant (2)

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Chesterfield Chesterfield Not Prequalified S26
Active • 2028-29 (T-4), 2027-28 (T-4)
5.40 MW
Chapelton, Fraserburgh, Aberdeenshire, Scotland, AB43 7BL (1 component)

Battery energy storage system, together with associated equipment, infrastructure and ancillary works.

Active • 2027-28 (T-4)
4.62 MW
Chapel Farm, Luton Road, Charlton, Luton, LU4 9UJ (6 components)

49.5 MW Battery Energy Storage facility (3)

Storage (Duration 2h) Storage (Duration 1.5h) HARMONY CF LIMITED New Build Generating CMU CHAPELFARM CHAPELFARM +3 more LU4
Active • 2025-26 (T-4), 2024-25 (T-1) ...
29.21 MW
Causeway Power, The Causeway Industrial Site, Maldon, CM9 4GG (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Storage (Duration 2h) URBAN RESERVE STORAGE LIMITED New Build Generating CMU Causeway Power Not Prequalified CM9
Active • 2026-27 (T-4)
1.18 MW
Catridge Farm, Wick Lane, Lacock, Chippenham, SN15 2LU (1 component)

A Battery Energy Storage System

Storage (Duration 2h) ETP-QQR ENERGY LIMITED New Build Generating CMU Cartridge Not Prequalified SN15
Active • 2025-26 (T-4)
Catahoula Fields, Eglantine Lane, Farningham, Kent, DA4 9JL (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Farningham Not Prequalified DA4
Active • 2027-28 (T-4)
0.68 MW
Castlelaurie Industrial Estate, Bankside, Falkirk FK2 7XF (1 component)

New build battery storage

Storage (Duration 2h) FALKIRK POWER LTD New Build Generating CMU BANKSIDE FK2
Active • 2028-29 (T-4)
7.66 MW
Carnegie Road, Stoneycroft, Liverpool, Merseyside, Liverpool City Region, L13 7GD (1 component)

Standalone battery energy storage system

Storage (Duration 2h) CARNEGIE (BES) LTD New Build Generating CMU QENER1_CANERGIE L13
Active • 2026-27 (T-4)
9.93 MW
Calow Green, Calow, S44 5XQ (3 components)

A Battery Energy Storage System

Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) ADV 005 LIMITED New Build Generating CMU Calow Green Calow Green +1 more Not Prequalified S44
Active • 2026-27 (T-4)
53.16 MW
Calow Green, Calow, North East Derbyshire, S44 5XQ (8 components)

A stand alone Battery Energy Storage System. (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
53.52 MW
Burton Green Farm, Hobs Lane, Kenilworth, Warwickshire, CV8 1QB (2 components)

New Build CMU comprising of battery storage and associated plant (2)

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Burton Green Burton Green Not Prequalified CV8
Active • 2028-29 (T-4), 2027-28 (T-4)
27.04 MW
Burton Enterprise Park Hawkins Lane Burton upon Trent Staffordshire DE14 1QG (1 component)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU BURTON086 DE14
Active • 2028-29 (T-4)
5.24 MW
Bumpers Farm Phase 2, Princes, Risborough, HP27 9RE (1 component)

Battery Storage Plant

Storage (Duration 2h) GRESHAM HOUSE SOLAR DISTRIBUTION LLP New Build Generating CMU Bumpers BESS HP27
Active • 2027-28 (T-4)
0.46 MW
Bumpers 2 BESS, Land at Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (1 component)

A battery energy storage system

Storage (Duration 2h) HEIT BF LIMITED Existing Generating CMU Bumpers 2 HP27
Active • 2025-26 (T-1)
12.73 MW
Bumpers 2 BESS, Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (1 component)

A new build battery energy storage system

Storage (Duration 2h) HEIT BF LIMITED New Build Generating CMU Bumpers 2 ESS HP27
Active • 2024-25 (T-1)
11.11 MW
Bumpers 1 BESS, Land at Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (1 component)

A battery energy storage system

Storage (Duration 2h) HEIT BF LIMITED Existing Generating CMU Bumpers 1 HP27
Active • 2025-26 (T-1)
12.73 MW
Bullen Lane, Bramford, Mid Suffolk, Suffolk, England, IP8 4JH (1 component)

Two hour duration battery storage

Active • 2028-29 (T-4)
12.56 MW
BSB Transport Ltd Trondheim Way, Redwood Park Estate, Stallingborough, Grimsby, North East Lincolnshire, DN41 8FD. (4 components)

A Battery Energy Storage System. (3)

Storage (Duration 2h) KXP IMMINGHAM LIMITED New Build Generating CMU Immingham Immingham +2 more Not Prequalified DN41
Active • 2026-27 (T-4), 2025-26 (T-1) ...
77.66 MW
Bronze Cricket Club, Chapel Lane, Great Barr, Walsall, WS9 0QU (2 components)
• 2 hr duration Battery Energy Storage System located in England
• Energy Storage Facility
Storage (Duration 1h) Storage (Duration 2h) CHAPEL LANE ENERGY STORAGE LIMITED New Build Generating CMU Chapel Lane ES Chapel Lane ES WS9
Active • 2028-29 (T-4), 2026-27 (T-4)
14.62 MW
Loading map...
Showing 25 locations