Storage (Duration 2h)

321 unique locations (1311 components) - Page 13 of 13

Tillingdown Lane, Caterham, CR3 7JA (4 components)
• A 12MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
15.04 MW
Tiln Farm BESS, Tiln Lane, Retford DN22 9JH (2 components)

Tiln Farm BESS is a 25MW 2-hour storage project built alongside a new solar farm at Tiln Farm.

Active • 2028-29 (T-4), 2025-26 (T-1)
10.79 MW
Todrig Farm Coldstream TD12 4JA (7 components)

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on agricultural land to the west of Eccles Substation and …

Active • 2028-29 (T-4)
71.20 MW
UK Power Reserve, Traston Road, Newport, South Wales, NP19 4RQ (4 components)
• CMU ID 22NEW1, a new build battery storage CMU
• CMU ID 23NEW1, a new build battery storage CMU
• CMU ID 24NEW1, a new build battery storage CMU
Active • 2025-26 (T-1), 2024-25 (T-1) ...
23.96 MW
Uskmouth Power Station West Nash Road, Nash, Newport, Wales, NP18 2BZ (2 components)

AW1 Energy Storage Limited (AW1) will develop a Battery Energy Storage System (BESS) at land adjacent to the substation and will initially develop a 120 MW / 240 MWh BESS …

Active • 2028-29 (T-4)
40.20 MW
Wadsworth Farm, Toronto, Bishop Auckland DL14 7RL (4 components)
• A 50MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
62.68 MW
Westfield Road, Carlton, Wakefield, WF3 3RJ (2 components)

Battery energy storage system

Active • 2028-29 (T-4)
20.90 MW
West House Farm, Scruton, Northallerton, DL7 0RQ (3 components)

18MW, 2-hour duration battery energy storage system (BESS). BESS is being constructed alongside a co-located solar PV farm which it shares a grid connection with. Solar PV farm has secured …

Active • 2028-29 (T-4)
7.54 MW
Wright Street, Paisley, Renfrew, PA4 8AN (3 components)

Battery Energy Storage, 49.990 MW installed for a 2hr system.

Active • 2028-29 (T-4)
20.94 MW
Loading map...
Showing 21 locations