Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

405 unique locations (2111 components) - Page 1 of 17

135 CLYDESDALE PLACE MOSS SIDE INDUSTRIAL ESTATE LEYLAND PR26 7QS (5 components)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
• CMU consisting of multiple reciprocating engines and alternators
• Component has yet to be procured.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
9.68 MW
165 Fordhouse Lane Stirchley Birmingham B30 3AG (2 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
8.38 MW
1, THE OLD BARN PURLIEUS, MINETY, MALMESBURY SN16 9RP (Nearest postcode to grid reference: SN16 9DX). (19 components)
• Battery Storage Plant
• Load reduction on site supported by non-exporting standby generation.
• Reciprocating genset in acoustic enclosure
Active • 2025-26 (T-4), 2023-24 (T-4) ...
53.56 MW
322 Broomloan Rd, Glasgow G51 2JQ (2 components)

A 50MW Distribution Connected Battery Energy Storage System

Active • 2028-29 (T-4)
20.94 MW
72-77 Lower Tower Street, Hockley, Birmingham, B19 3NF (2 components)

New build battery storage

Active • 2028-29 (T-4)
17.80 MW
Abbey Home Farm, Burford Road, Cirencester, GL7 5HF (1 component)

A Battery Energy Storage System

Active • 2025-26 (T-4)
11.12 MW
adjacent to Kilmarnock South Substation KA1 3TN (2 components)
• 200MW battery storage located near to the SPT Kilmarnock South substation, split into two BMU's
• 200MW battery storage located near to theSPT Kilmarnock South substation, split into two BMU's
Active • 2026-27 (T-4)
47.26 MW
Adswood Road, Cheadle Hulme, Stockport, Greater Manchester, SK8 5QY (4 components)
• New Build CMU comprising of battery storage and associated plant
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2020-21 (T-4)
36.62 MW
Aikengall 2a Wind Farm Innerwick EH42 1SG (1 component)

New Build Battery Energy Storage System. To be connected at WesterDod 132kV substation.

Active • 2027-28 (T-4)
6.70 MW
Alne Material Recovery Facility, Forest Lane, Alne, York, YO61 1TU (13 components)
• Existing Generating CMU comprising of a gas fuelled reciprocating engine and gas delivery plant.
• Generating CMU comprising of a CHP asset producing energy from waste
• New Build Generating CMU comprising of a CHP asset producing energy from waste.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
14.36 MW
Arbroath Battery, East Muirlands Road, Arbroath, DD11 2QH (14 components)
• Battery storage plant
• Existing generating battery storage unit.
• New Build Generating CMU comprising of a battery storage asset
Active • 2025-26 (T-4), 2024-25 (T-1) ...
50.58 MW
Ardencaple Farm, Rhu, Helensburgh, Argyll & Bute, G84 8JX (1 component)

A 50MW Distribution Connected Battery Energy Storage System

Active • 2028-29 (T-4)
10.47 MW
Arran View Jameston Farm Dalry North Ayrshire KA24 4EY (1 component)

13 x 3.800MW / 7.491MWh storage units installed on designated land within a brownfield site at Jameston Farm, Dalry, North Ayrshire, KA24 4EY

Active • 2026-27 (T-4)
11.79 MW
Ashlett Creek, Fawley, Hampshire, SO45 1DT (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2027-28 (T-4)
11.08 MW
Ashley Clinton Estate, Milford-on-Sea, Lymington, SO41 0LA (2 components)

A standalone 0.949MW BESS connected directly to the DNO network

Active • 2025-26 (T-1)
0.52 MW
Auchteraw Farm, Fort Augustus, PH32 4BT (5 components)
• CMU consisting of a gas reciprocating engine and alternator
• New build battery storage CMU with CMU ID 22AUC1
• New build battery storage CMU with CMU ID 24AUC1
Active • 2025-26 (T-1), 2023-24 (T-4) ...
62.91 MW
B970, Boat of Garten, Highland, Scotland, PH24 3BY, United Kingdom (1 component)

New build 49.9MW / 99.8MWh battery energy storage system

Active • 2027-28 (T-4)
4.62 MW
Barton Hill Way, Torquay, TQ2 8JG (8 components)
• 0.15MW of demand reduction
• Existing CMU comprising of battery storage and associated plant
• New Build CMU comprising of battery storage and associated plant
Active • 2025-26 (T-4), 2024-25 (T-1) ...
32.55 MW
Basingstoke Energy Storage Facility, Basing Road, Old Basing, Basingstoke, Hampshire, RG24 7AL (4 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• New Build CMU comprising of battery storage and associated plant
Active • 2027-28 (T-4), 2025-26 (T-1) ...
8.71 MW
Batchworth Cryptosporidium Barrier, Church Street, Rickmansworth, Hertfordshire, WD3 1JJ (6 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• Water Pumping Station
• Water pumping station
Active • 2028-29 (T-4), 2017-18 (TR)
62.77 MW
Birch Road, Colchester CO2 0EJ (2 components)

This CMU component represents the BESS system of a co-located (solar and storage) site

Active • 2025-26 (T-1)
15.16 MW
Blandford Road, Poole, BH16 6AB (5 components)
• A 25 MW Battery Storage Site
• A 25MW New Build Battery Storage Site
Active • 2026-27 (T-4), 2025-26 (T-1) ...
37.29 MW
Braehead Farm Riccarton Kilmarnock KA1 5LN (4 components)

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on agricultural land, approximately 250 Metres north of Kilmarnock Substation. …

Active • 2028-29 (T-4)
71.20 MW
Loading map...
Showing 25 locations