Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

3 unique locations (10 components)

Batchworth Cryptosporidium Barrier, Church Street, Rickmansworth, Hertfordshire, WD3 1JJ (6 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• Water Pumping Station
• Water pumping station
Active • 2028-29 (T-4), 2017-18 (TR)
62.77 MW
Land south east of Sundon Substation Water End Lane Chalton, Luton LU4 9UB (2 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2026-27 (T-4), 2025-26 (T-1)
20.27 MW
Land south east of Sundon Substation Water End Lane Chalton, Luton LU4 9UB (2 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active • 2025-26 (T-4), 2025-26 (T-1)
12.48 MW
Loading map...
Showing 3 locations