Storage (Duration 2h)

4 unique locations (42 components)

Active MW: 66252.80 MW
Inactive MW: 150.27 MW
former Teesside Power Station; Greystone Road, Grangetown, Middlesbrough, TS6 8JF (7 components)

CMU to comprise multiple individual storage units metered and despatched centrally

Active • 2026-27 (T-4), 2025-26 (T-4) ...
66.67 MW
Former Teesside Power Station; Greystone Road, Grangetown, Middlesbrough, TS6 8JF (7 components)

CMU to comprise multiple individual storage units metered and despatched centrally

Active • 2026-27 (T-4), 2025-26 (T-4) ...
66.67 MW
"Sembcorp UK Headquarters Wilton International Middlesbrough TS90 8WS United Kingdom" (14 components)
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S17G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S19GT2 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S20G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
Active • 2029-30 (T-4), 2028-29 (T-4) ...
153.09 MW