Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

2 unique locations (99 components)

AB51 (98 components)
• Domestic EV
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.23 MW
Land at Rothienorman, Badenscoth, Aberdeenshire, Scotland, AB51 8XQ (1 component)

49.9 MW Grid connection Battery Storage site.

Active • 2026-27 (T-4)
9.93 MW
Loading map...
Showing 2 locations