Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

10 unique locations (14 components)

Active MW: 0.00 MW
Inactive MW: 0.00 MW
Wadsworth Farm, Toronto, Bishop Auckland DL14 7RL (2 components)
• A 50MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Storage (Duration 2h) Storage (Duration 4h) ROOT-POWER (NORTH) LIMITED New Build Generating CMU Wadsworth Wadsworth 2 DL14
Active • 2028-29 (T-4)
31.34 MW
Selby, North Yorkshire, YO8 6PG (2 components)
• A 40MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Storage (Duration 2h) Storage (Duration 4h) ROOT-POWER (NORTH) LIMITED New Build Generating CMU Greenacres Greenacres 2 YO8
Active • 2028-29 (T-4)
25.07 MW
Land On The South East Side Of Medlock Road, Failsworth, Manchester M35 9WG (2 components)

A 30MW Distribution Connected Battery Energy Storage System

Storage (Duration 2h) ROOT-POWER (NORTH) LIMITED New Build Generating CMU Medlock Not Prequalified M35
Active • 2029-30 (T-4), 2028-29 (T-4)
12.88 MW
Land off Station Road, Camblesforth, Selby, YO8 8JU. (1 component)

A 99MW Battery Energy Storage System .

Active • 2029-30
21.76 MW
Land at Hastings Hill Farm, Foxcover Road, Sunderland. SR4 9LB (1 component)

A 38MW Battery Energy Storage system.

Active • 2029-30
8.35 MW
Knuzden Moss Farm, Stanhill Road, Oswaldtwistle. BB5 3RE (1 component)

A 60MW Battery Energy Storage System.

Active • 2029-30
13.19 MW
Ellen Road Farm, Newhey, Rochdale, OL16 4NU. (1 component)

A 30MW Battery Energy Storage System.

Active • 2029-30
6.59 MW
Cooklands farm, Old Snydale, Pontefract, WF7 6HA (2 components)

A 50MW Distribution Connected Battery Energy Storage System

Storage (Duration 2h) ROOT-POWER (NORTH) LIMITED New Build Generating CMU Cooklands Not Prequalified WF7
Active • 2029-30 (T-4), 2028-29 (T-4)
21.46 MW
Ardencaple Farm, Rhu, Helensburgh, Argyll & Bute, G84 8JX (1 component)

A 50MW Distribution Connected Battery Energy Storage System

Storage (Duration 2h) ROOT-POWER (NORTH) LIMITED New Build Generating CMU Ardencaple Rejected G84
Active • 2028-29 (T-4)
10.47 MW
Loading map...
Showing 10 locations