Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

16 unique locations (45 components)

165 Fordhouse Lane Stirchley Birmingham B30 3AG (2 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
8.38 MW
Burton Enterprise Park Hawkins Lane Burton upon Trent Staffordshire DE14 1QG (2 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
10.47 MW
Land at Lincomb Farm, Lincomb, Stourport-On-Severn, DY13 9RB (1 component)

Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.

Active • 2027-28 (T-4)
18.47 MW
Land at Slack Lane, Westhoughton, Bolton BL5 3LG (1 component)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours

Active • 2026-27 (T-4)
2.36 MW
Land Lying To The South Of Manor Farm, Ratcliffe On Soar, Nottingham NG11 0EA (1 component)

Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.

Active • 2027-28 (T-4)
18.47 MW
Land North Of Stoke Lane Dunston Norfolk, NR14 8QD (2 components)

" Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration"

Active • 2028-29 (T-4)
29.32 MW
Land off Barge Way, Kemsley Fields Business Park, Sittingbourne ME10 2FE (2 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
41.84 MW
Land Off Severn Road Hallen Bristol South Gloucestershire BS10 7SE (2 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
29.32 MW
Land off Sir William Smith Road, Kirkton Industrial Estate, D11 3RD (2 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
20.94 MW
Land West Of Kegworth Road, Ratcliffe On Soar, Nottinghamshire,NG11 0EA (2 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
41.84 MW
Land West Of Slack Lane, Westhoughton, Bolton BL5 3LB (2 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
6.28 MW
Land West Of Slack Lane, Westhoughton, Bolton, BL5 3LB (1 component)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
6.28 MW
lLand off Lincomb Lane, Lincomb, Stourport On Severn, DY13 9RB (2 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
41.46 MW
Steam Lane, Avonmouth industrial Estate, Bristol, BS11 0YT (4 components)

20 x 1.1MWh battery modules connected to provide 10MW max instantaneous output and 20MWh energy output per day. All batteries are class [XX].

Active • 2026-27 (T-4), 2023-24 (T-1)
13.44 MW
STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JB (4 components)
• Battery energy storage facility with a 2 hour duration and a maximum capacity of 14 MW, located in Buxton.
• Battery energy storage facility with a 2 hour duration and a maximum capacity of 14MW, located in Buxton
Active • 2025-26 (T-1), 2024-25 (T-1)
38.34 MW
West Marsh Road Spalding Lincolnshire PE11 3BB (15 components)
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxiliary load.
• A new open cycle power station comprising gas turbines and associated balance of plant. This is being constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxillary load.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
259.70 MW
Loading map...
Showing 16 locations