Storage (Duration 2h)

14 unique locations (170 components)

1, THE OLD BARN PURLIEUS, MINETY, MALMESBURY SN16 9RP (Nearest postcode to grid reference: SN16 9DX). (19 components)
• Battery Storage Plant (2)
• Reciprocating genset in acoustic enclosure
Active • 2025-26 (T-4), 2023-24 (T-4) ...
532.52 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (92 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage).
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2324.15 MW
Former Teesside Power Station; Greystone Road, Grangetown, Middlesbrough, TS6 8JF (1 component)

CMU to comprise multiple individual storage units metered and despatched centrally

Active • 2025-26 (T-4)
59.60 MW
Land at Capenhurst Sub Station, Capenhurst, Cheshire, CH66 2HJ (6 components)
• A New Build Battery Energy Storage System
• A New Build Gas fuelled power plant at Capenhurst substation
Active • 2025-26 (T-4), 2024-25 (T-4) ...
129.72 MW
Land at Legacy Substation, Bronwylfa Road, Legacy, Wrexham, LL14 4HY (4 components)
• A Battery Energy Storage System
• A gas fuelled generating station.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
76.08 MW
Land north west of Braintree Substation Braintree Road Cressing, Braintree CM77 8EZ (3 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2027-28 (T-4), 2026-27 (T-4) ...
33.18 MW
Land Off 9 Coal Pit Lane, Atherton, Manchester, M46 0RL (5 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 30MW for a 1 hour duration installed on designated land within a compound at Atherton
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• New Build 2 hour battery storage system.
• ... and 1 more unique description
Active • 2026-27 (T-4), 2025-26 (T-4) ...
19.20 MW
Land To East Of Balsillie Avenue And To The South Of The Limekilns, Glenrothes, Fife, KY6 3ET (3 components)

This is a 49.99MW battery storage facility connected at 33kV.

Active • 2026-27 (T-4), 2025-26 (T-1) ...
33.35 MW
Land to West of Welkin mill, Welkin Rd, Lower Bredbury, Stockport, SK6 2BH (9 components)
• A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• A 20MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• ... and 2 more unique descriptions
Active • 2025-26 (T-4), 2024-25 (T-4) ...
46.50 MW
South East of Norwich Substation, Ipswich Road, Stoke Holy Cross, South Norfolk, Norfolk, England, NR14 8PQ (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2026-27 (T-4)
8.98 MW
Whaddon Farm, Hilperton, Wiltshire, BA14 6NR. (4 components)
• New build generating CMU component - Whaddon Farm BESS
• New build generating CMU component - solar photovoltaic park known as Whaddon Farm Solar Park.
Active • 2027-28 (T-4), 2024-25 (T-1)
2.42 MW
Winchester power Generation Plant, Port Lane, Hursley, Winchester, SO21 2UZ (7 components)
• Existing CMU comprising of battery storage and associated plant
• New Build CMU comprising of battery storage and associated plant
Active • 2026-27 (T-4), 2025-26 (T-1) ...
13.65 MW
Wolverhampton West, Land North of Langley Road, Castlecroft, Wolverhampton, NEAREST POSTCODE WV4 4XX (5 components)
• Two duration battery storage
• Two hour duration battery storage
Active • 2028-29 (T-4), 2027-28 (T-4) ...
28.56 MW